laitimes

Chen Ping investigated the construction of the Lunan Industry-University-Research Collaborative Innovation Demonstration Zone

author:Lightning News

Qilu Network Lightning News October 21, 2010 On the morning of October 21, Chen Ping, secretary of the Zaozhuang Municipal Party Committee and director of the Standing Committee of the Municipal People's Congress, went to Xuecheng District to investigate the construction of the Lunan Industry-University-Research Collaborative Innovation Demonstration Zone. Cao Shengqiang, secretary of the Party Committee of Zaozhuang College, Li Wenxi, deputy secretary of the Party Committee and dean of Zaozhuang College, and Liu Zhicai, deputy director of the Standing Committee of the Municipal People's Congress and deputy commander of the Construction Headquarters of the Lunan Industry-University-Research Collaborative Innovation Demonstration Zone, attended the event.

Chen Ping first came to the project site of Shandong Publishing Zaozhuang Wanyue Cultural Square, listened to the report on the design concept, venue layout, functional effects, etc., and inquired about the current difficulties and problems of the project. Chen Ping pointed out that the Wanyue Cultural Square project is not only an important cultural project, but also an important infrastructure for improving the public services of the new city. It is necessary to firmly establish the awareness that "fast is the overall situation", actively coordinate and solve the problems and difficulties existing in the project construction, and continuously accelerate the pace of project construction. It is necessary to clarify the project positioning, optimize the planning layout, plan the layout format according to the needs of the masses, and strive to create a first-class cultural landmark in Zaozhuang, so that the masses can share the fruits of cultural development.

At the Municipal Cultural and Sports Center, Chen Ping inspected the sand table of the second phase of the new campus of Zaozhuang College and learned in detail about the layout, overall planning and construction cycle of the college. Chen Ping stressed that the construction of the new campus of Zaozhuang College is a key project determined by the municipal party committee and the municipal government, which has attracted the attention of all sectors of society. It is necessary to establish a green construction concept, optimize the construction plan, scientific construction, safe construction, do a good job in the construction of supporting facilities such as faculty dormitories, student apartments, and canteens, and all work should be rushed forward and forward to ensure that it is put into use as planned. Zaozhuang College should base itself on its own advantages and characteristics, comprehensively dock local needs, and provide intellectual and talent support for the high-quality development of Zaozhuang City.

Subsequently, Chen Ping came to the site of the second phase of the Municipal Hospital of Traditional Chinese Medicine and listened to the report on the project capital investment, characteristic highlights, and project progress. Chen Ping pointed out that the current temperature is gradually cooling, the construction conditions are more difficult, and the safety responsibility is also greater. Construction units should overcome the influence of unfavorable factors such as winter construction, reverse the construction schedule, wall chart operations, and increase efforts to ensure that the project is completed on schedule. The Municipal Hospital of Traditional Chinese Medicine should further strengthen the supporting construction, enhance the comprehensive capacity, and provide patients with better medical services.

Chen Ping also came to the site of the Relocation project of Shandong Coal Sanitation School, inspected the specific environment of the school construction site, learned more about the planning plan, design standards, school scale, etc., and solved the problems and difficulties faced by the project construction face-to-face. Chen Ping demanded that we should strengthen communication and coordination, close coordination and cooperation, adhere to the principles of legal compliance and reasonableness, fully consider the needs of project construction, pay close attention to the preliminary work tasks, and ensure that construction starts as soon as possible.

Chen Ping stressed that the Lunan Industry-University-Research Collaborative Innovation Demonstration Zone is an important carrier for promoting the integration of industry and city and the integration of industry and city in the new urban area, which is of great significance for Zaozhuang City to accelerate the "strong industrial city, industrial prosperity city" and achieve high-quality development. The engineering headquarters should play a leading role, coordinate the relations between all parties, unite the strength of all parties, solve difficult problems, and make overall plans for project construction. Under the premise of ensuring quality and safety, all construction units should speed up, intensify and ensure progress, and go all out to promote the early construction and early completion of the project. Xuecheng District should fulfill its territorial responsibilities and provide a good environment and conditions for the construction of the demonstration area.

Lightning News reporter Li Yongwen correspondent Kou Guang reported

Read on