Lasted for one year, the display of decoration results and the summary of lessons learned (Mitsubishi Heavy Industries pit consumer follow-up)

author:Tess Foreign Trade Club
Lasted for one year, the display of decoration results and the summary of lessons learned (Mitsubishi Heavy Industries pit consumer follow-up)

Text | Tess

Official number: Tess Foreign Trade Club (Tess_2006)

01

It took a year, and finally the house was finished.

6 bedrooms, 5 bathrooms, 1 study, 2 living rooms, wine cellar, tea room, fitness area, storage room

Show off the common areas: living room on the 1st and minus 2nd floors, study, wine cellar.

1st floor living room and study

↓↓↓

Video loading...

Negative second floor living room

↓↓↓

Video loading...

Decoration is not only tiring, but also expensive, the key is that many times, spending money may not necessarily bring the effect you want.

Overall, in addition to the central air conditioning and fresh air system is a big failure, the rest is OK. Although there are some minor imperfections, it does not affect the overall effect.

experience:

1. Designers are important.

The level of the designer (mainly aesthetic) is very important, and the design of the house lays the decoration effect, because the later construction is done according to the renderings.

Although a good designer is expensive (the design fee of my house is 72,000), it can guarantee the effect.

2. Foundation decoration is very important

The decoration companies in the market are uneven, and it is recommended to prefer a large brand and a decoration company with a long history of establishment.

Such a company at least understands the construction code and will not run halfway.

I first found a renovation company and talked well in the early days, but then I didn't use them. There are 4 reasons:

A. The payment terms are too domineering.

80% advance payment, half of the project is completed, pay 95%, after the completion of the project acceptance, pay the remaining 5%.

In my opinion, they are empty gloves white wolves, let the owners prepay all the expenses, take all the risks, I certainly don't do it.

B. The project time is too long, and it takes 8 months to complete the basic decoration.

C. The designer in charge of my project left.

The designer is the soul of a project. Construction workers can find replacements, but original designers are hard to find. I am worried that the subsequent recipient designers will not be able to fully understand the original designer's design intentions, and there will be problems when the project is landed.

The design contract of the big-name renovation company went like this:

Since the designer left, the company could not perform the follow-up service, but I had already got the renderings, so I paid the remaining 36,000 to the designer to follow up the renovation from start to finish.

D, I found a quotation is almost the same, the payment terms are better (30% advance payment, 30% in the middle term, 40% after the end of the project), the construction period is shorter (5 months), and the owner of this decoration company lives in the same community as me. Neighbors, in terms of human feelings, will also be more cautious.

3. Whole house customization

Whole house customization is best to find a big brand, mainly quality and delivery time are guaranteed.

4. Give full play to the advantages of foreign trade

My home appliances, bathrooms, furniture, are provided directly by my suppliers and members of Tess Foreign Trade Club. Some are also sent by the supplier for free.

Like what:

The headlights of the living room on the second floor of the negative are sold for 87,000 on the market, and it is also about 50,000 to break the bone. Factory 10,000 invoices for me to make a lamp.

0 cold water with circulating pump hot water system, isolated neighbors cost 1.4 million, I spent 2000.

The sofa of the first layer of cowhide belt function chair is bought on the market for 12,000-1.5 million, and the Club member sells me 5500

Smart toilets sell 3000-5000/pc, and Club members 3700 sell me 5.

The 80 spotlights and all the switch sockets were factory sent by girlfriends.

。。。。。。。

Anyway, since I have more than 10,000 foreign trade companies as a club member, I cover almost all aspects of life and the industries that people need.

So, every time I need a product, just yell in the Club group, and I can quickly find the supplier, and the supplier is still very reliable and will not pit me.

Lasted for one year, the display of decoration results and the summary of lessons learned (Mitsubishi Heavy Industries pit consumer follow-up)

02

Finally, let's talk about the biggest failure: Mitsubishi Heavy Industries Central Air Conditioning.

I signed an ultra-thin and ultra-quiet air conditioner with the dealer, and later in the process of testing, there were various strange problems:

(Related Reading:

Is this Japanese company (Mitsubishi Heavy Industries) doing false propaganda? Or Chinese pit Chinese?

Written to people who believe in Japanese quality: (with a recording of a conversation with Mitsubishi Heavy Industries)

After the problem appeared, the dealers of Mitsubishi Heavy Industries and the after-sales service went to the scene twice, saying that this was a normal phenomenon, and the reason why the air conditioner did not heat up successively attributed to the fact that

The reason for the loud noise is that their ultra-quiet air conditioner is like this.

The third time, a person named Hu Bing, who claimed to be the head of the Henan office of Mitsubishi Heavy Industries, told me on WeChat that there was a problem with the design of my house that caused the air conditioner to not be heated.

He also said that the description of my public account was nonsense, threatening me to delete the text and apologize, otherwise they would let their legal affairs hold me accountable.

Lasted for one year, the display of decoration results and the summary of lessons learned (Mitsubishi Heavy Industries pit consumer follow-up)
Lasted for one year, the display of decoration results and the summary of lessons learned (Mitsubishi Heavy Industries pit consumer follow-up)
Lasted for one year, the display of decoration results and the summary of lessons learned (Mitsubishi Heavy Industries pit consumer follow-up)

Seeing that they were so bullish, even the internal statements were not uniform and dared to threaten me, so I directly found the expert group of the Chinese Academy of Sciences to do the identification of central air conditioning, and let the experts identify the air conditioner in my home. (The appraisal institution under the Chinese Academy of Sciences is the appraisal institution designated by the local high courts, and its authority is beyond doubt.) )

Before the appraisal, I asked Mr. Li to notify Mitsubishi Heavy Industries and its distributors separately, and let them go to the scene to identify with the expert group of the Chinese Academy of Sciences, but they all refused to come to the scene.

After identification, the results are as follows:

1. The goods are not on the board

The air conditioner installed in my home is not Mitsubishi Heavy Industries' ultra-thin and ultra-quiet series at all, which can explain part of the noise problem.

As soon as I think of this, I am very angry, the contract is clearly signed is the ultra-thin ultra-quiet series, the money I paid is also paid according to the ultra-thin ultra-quiet series, they actually stole the beam to change the pillar, let Li Ghost impersonate Li Kui.

2. Design defects, especially living rooms and dining rooms, simply do not meet the heating standards.

3. Installation defects:

The air duct, divergence pipe, and insulation are all installed defectively, and the girls' room and the second bedroom air conditioner are installed in the reverse.

4. Serious design and construction defects:

The fresh air system has no access port, and it is impossible to carry out subsequent maintenance and maintenance, so that the fresh air system becomes a disposable product.

5. There is no construction drawing, and the installer works on the spot according to the feeling of installation.

6. The refrigerant is seriously problematic, and there are three kinds of messy things mixed in it.

As a result of the above 6 problems, the central air conditioning and fresh air system that I spent 119,000 installs turned into a pile of garbage.

After the appraisal report came out, I took the report and directly sued Mitsubishi Heavy Industries and its dealers, demanding that the contract be terminated and the losses compensated.

At this time, the dealer of Mitsubishi Heavy Industries asked Lawyer Li to reconcile with me, and I let them roll.

The most shameless thing about this company is that it is not only dishonest, but also cut corners.

After a product problem,

It remains to be seen how Mitsubishi Heavy Industries and its dealers defend themselves in court.

I will also continue to keep you informed of the progress of the case.

I have to take out these pests that hurt consumers and make them pay the price!

The above is the experience and lessons of the renovation for a year.

I hope that after later people see it, do not enter the pit, especially when buying central air conditioning, avoid Mitsubishi Heavy Industries.