laitimes

Wang Yongming investigated the key transportation construction projects in our county

author:Tokiyama release
Wang Yongming investigated the key transportation construction projects in our county

On January 16, Wang Yongming, deputy secretary of the county party committee and acting county governor, led the heads of the county transportation bureau, the development and reform bureau, the asset management bureau and other departments to investigate the key transportation construction projects in our county. County leader Jiang Guangming attended.

Wang Yongming investigated the key transportation construction projects in our county

Wang Yongming and his party successively went to Hangjinqu East Interchange Toll Plaza, Yangjiabu Bridge Along the River Highway Intersection, Zigang Street Changxu Bridge, G205 Changshan Liangshan Bank, Tonggong Township Jinchuanyuan Village, Huibu Town Songfa 351 National Highway and 48 Provincial Highway Junction, Xinchang Township Songfang Line to Xinchang Bridge and Changshan County Passenger Transport Center and other places, field research on the improvement of the landscape node of the highway intersection, the middle and upper reaches of the Qiantang River Changshan River Avionics Hub, 205 National Highway, 324 Provincial Highway, Key transportation projects such as the service area of the west Zhejiang window and the upgrading and reconstruction of the road from Fangcun to Xinchang. Subsequently, a symposium was held to listen to the relevant situation reports.

Wang Yongming investigated the key transportation construction projects in our county

Wang Yongming pointed out

Transportation is the "forerunner" of economic development, a prerequisite for accelerating development and catching up with development, a basic project for achieving common prosperity, and a key factor in Changshan's accelerated construction of the "first gateway to western Zhejiang". In the past year, the transportation system of our county has based on the journey of common prosperity, adhered to a pragmatic and pragmatic style, actively docked upwards, grabbed policy dividends, and achieved new positions and made new breakthroughs in many work such as provincial and municipal assessments.

Wang Yongming stressed

It is necessary to grasp the comprehensive transportation planning with the pattern of "the first gateway to western Zhejiang". Starting from the construction needs of the "first gateway in western Zhejiang", adhering to the system thinking and overall concept, combining the urban development framework, population agglomeration and other factors, we will step up the docking of the Quhuang high-speed railway and the Hangzhou-Quzhou high-speed railway, and accelerate the construction of a safe and efficient comprehensive transportation system that "gathers in western Zhejiang, connects the four provinces, and connects the whole country". It is necessary to grasp the construction of projects with the requirement of speeding up and improving efficiency. Accelerate the construction of key projects such as the development of the Changshan River waterway, upgrade and reconstruct the landscape nodes along the highway, and decorate the urban and rural roads through greening and beautification, making it an important window to show the common prosperity and beauty of Changshan. It is necessary to promote the connection between urban and rural roads from the perspective of common prosperity. Construct a comprehensive urban and rural transportation system with high standards, excellent quality and wide coverage, and create a "beautiful transportation corridor" with Changshan characteristics, making it a beautiful landscape, a historical and cultural line, an industrial development line, and an ecological enrichment line. It is necessary to strengthen the guarantee of elements in the spirit of "two diligences" and "two specializations." With the thinking of being good at operation and system integration, we take the initiative to plan projects, actively dock upwards, and strive to promote a number of new projects to be included in the national, provincial and municipal transportation construction plates. It is necessary to strengthen safety management in a soft and hard approach. Transportation departments should rationally design and formulate road construction plans, strengthen traffic safety management, make overall plans for road construction and safety precautions, and effectively reduce road traffic safety hazards.

Wang Yongming investigated the key transportation construction projects in our county

"How many shifts per day?" How many passengers are there? During the investigation, Wang Yongming also came to the ticket window of Zhaojiaping Passenger Transport Center, the station entrance and the urban and rural bus dispatching command center to carefully check the epidemic prevention and control and the preparation for the Spring Festival. He stressed that the passenger transport center, as an important hub of transportation in the county, is the main gateway for the entry and exit of people inside and outside the county, and is also a key place for epidemic prevention and control. It is necessary to strictly implement epidemic prevention and control measures, take resolute and effective prevention and control measures, stand well in the "traffic post" of epidemic prevention and control between scale and temperature, guard the "first pass" of entry and exit, and escort the people's travel.

Reporter: Zheng Yuehong Hu Zhipeng

Editor: Chen Jiajun

Wang Yongming investigated the key transportation construction projects in our county
Wang Yongming investigated the key transportation construction projects in our county

Read on