Source: CCTV news client

At 20:30 on December 31, 2021, on the eve of the New Year's Day holiday, Hainan Traffic Control found that the G98 Hainan Ring Island Expressway K294+038 upward wave river bridge Sanyatai bridge head plate appeared hollow during the inspection. After investigation, the place is backfilled and hollowed out for the back of the abutment, and the middle position of the bicycle lane is in the direction of the emergency lane, and the hollow is about 2 meters long, about 7 meters wide, and about 2 meters deep, and the safety hazard is prominent, posing a greater threat to driving safety.
The Hainan Provincial Transportation Department and the Provincial Highway Bureau attach great importance to it, and Hainan Traffic Control made arrangements at the first time and launched an emergency plan. Coordinate the relevant departments to carry out traffic control in a timely manner, close the lanes and emergency lanes, and retain the passing lanes to ensure the safety of driving. At 14:00 on January 1, 2022, the construction personnel, equipment and materials were in place, and the rescue officially began. Hainan Traffic Control will implement 24-hour uninterrupted construction, strive to complete the implementation of the temporary disposal plan by January 3, open traffic as soon as possible, and make every effort to ensure driving safety.
(Reporter Ye Fei)