Source: People's Daily News
The reporter learned from the China National Railway Group (hereinafter referred to as the State Railway Group) that the Changbaishan to Dunhua section of the Shenyang-Jiamusi high-speed railway (hereinafter referred to as the Baidun section of the Shenjia high-speed railway) was opened for operation today, and the Changbai mountain scenic area was connected to the national high-speed rail network, and the fastest from Changchun to Changbaishan was 2 hours and 18 minutes.

Shenjia high-speed railway Baidun section is located in Yanbian Korean Autonomous Prefecture, Jilin Province, from Changbaishan Station in Erdaobaihe Town, Antu County in the south to Dunhua South Station in Dunhua City in the north, with a total length of 99 kilometers and a design speed of 250 kilometers per hour, with 3 stations in Changbaishan, Yongqing and Dunhua South, of which Dunhua South Station is a reserved station; Dunhua South Station to Dunhua Station is a new liaison line, with a length of 12 kilometers.
Changbaishan high-speed rail station station building. Photo by Li Yang of the People's Daily Network
The Baidun section of the Shenjia high-speed railway runs through the primary forest and reaches the foot of changbai mountain, a national 5A-level scenic spot, known as the "forest high-speed railway", with undulating mountains along the line, many sections of frozen soil and wet areas, and great pressure on environmental protection.
Train sets travel safely in the mountains. Photo by Liu Shenku
After the opening of the Baidun section of the Shenjia high-speed railway, the railway department will arrange for the opening of 5 pairs of mobile train sets, with a maximum operating speed of 250 kilometers per hour. When the national railway operation map is adjusted on January 10, 2022, trains will be arranged according to daily lines, weekend lines and peak lines, and the maximum number of mobile train sets will be 14 pairs on a single day.
The Baidun section of the Shenjia high-speed railway opened for operation on the 24th. Photo by Li Yang of the People's Daily Network
Shenjia high-speed railway Baidun section is changchun to Hunchun high-speed railway to the southern end of the extension, after the opening of operation, Changchun to Changbai Mountain between the formation of a railway rapid passenger channel, will further improve the northeast of the railway network structure, greatly facilitate the travel of people along the line, conducive to promoting the development of tourism resources in Changbai Mountain, to accelerate the urbanization along the line, to promote the comprehensive revitalization of the northeast, is of great significance.
Staff celebrate the opening of the train. Photo by Li Yang of the People's Daily Network
It is reported that the railway department has begun to sell passenger train tickets for the Baidun section of the Shenjia high-speed railway, and the specific number of trains, time and other information can be queried on the "China Railway" WeChat and railway 12306 website, WeChat, and client.
Source| People's Daily Wang Lianxiang Li Yang