laitimes

Nissin ends day, nothing happens overnight! Chaoyang District combed through the 89 Winter Olympic test matches and solved all the problems

In the 2021 Winter Olympics test activities and test matches, the National Speed Skating Hall, the National Aquatics Center and the National Gymnasium have all done due diligence. Chaoyang District sorted out a total of 89 problems in five categories, all of which have been solved. This is what this reporter learned from the "two sessions" in Chaoyang District. At present, Chaoyang District will shift the focus of its work to the service guarantee of the Winter Olympic Games and the Winter Paralympic Games.

Nissin ends day, nothing happens overnight! Chaoyang District combed through the 89 Winter Olympic test matches and solved all the problems

Test Match "Nissin Ends, Nothing Happens Overnight"

Chaoyang District is one of the venues of the 2022 Beijing Winter Olympics, in the test activities and test matches, Chaoyang District and 3 competition venue teams jointly compiled "one map, one table, one book", high standards to build venue facilities, to achieve "due diligence, comprehensive inspection".

Holding test activities and test matches is the most direct and effective test of a region's ability to host the Olympic Games. Yang Ping, a first-level researcher at the Beijing Olympic Park Management Committee, introduced that during this year's test activities and test matches, adhere to the "early scheduling, late regular meeting" system, so that the day is clear, the matter does not stay overnight, and a total of 89 problems in 5 categories such as epidemic prevention, accommodation, catering, transportation, and daily security have been solved.

During the test match, Chaoyang District successfully completed the task of accommodation protection, implemented the whole chain control of the source of ingredients, carried out foodborne doping testing, and ensured the safe dining of more than 140,000 people. Build a tocc intelligent platform, improve the traffic scheduling system, meet the transportation needs of airports, hotels, venues and routes, open 27 traffic operation routes, and dispatch 1351 vehicles of various types. Completed the transformation of 15 welfare vehicles and ensured that their one-way transfer time was controlled within 50 minutes, and achieved "barrier-free" travel for 12 participating teams.

At present, the service guarantee task of the test match has been successfully completed, and Chaoyang District will shift the focus of its work to the service guarantee of the Winter Olympic and Paralympic Winter Games on the basis of consolidating the test results.

Nissin ends day, nothing happens overnight! Chaoyang District combed through the 89 Winter Olympic test matches and solved all the problems

Multi-departmental group special classes to ensure accommodation and catering

According to reports, Chaoyang District mainly undertakes the tasks of accommodation, epidemic prevention, catering, environment and other security tasks, and involves special work such as opening and closing ceremonies, torch relay, and cultural activities.

In terms of accommodation security, with reference to the test match guarantee model, a special work class is formed, and professional departments such as cultural tourism, health and health, and market supervision are stationed throughout the process, and comprehensively guarantee services such as accommodation, epidemic prevention, and catering.

In terms of catering security, the matching of 167 points of inspection support, on-site support and emergency disposal personnel has been completed, and all personnel of the support team have been organized to participate in 5 rounds of business training, and the work plan for food safety assurance has been preliminarily formulated.

In terms of environmental construction, a number of landscape nodes have been formed in the layout of Olympic Sports Middle Road, Beitucheng Road Junction, And Minzuyuan Road, and environmental improvement projects such as road maintenance and transformation of Beijing Olympic Park, improvement of barrier-free facilities, key areas and road greening have all been completed.

Make every effort to build a solid security barrier for epidemic prevention and control

In the next stage, Chaoyang District will make every effort to build a safety barrier for epidemic prevention and control, form an emergency response team, carry out emergency training drills at different levels and classifications, and improve the emergency response capability of the whole process of epidemic prevention and control. Carefully provide accommodation travel quality services.

We should close the source of food safety, scientifically and rationally arrange diet, and incorporate garbage classification and "disc action" into the work system to ensure that meals are rich and absolutely safe.

Do a solid job in urban operation and environmental protection. Carry out the investigation of hidden dangers of municipal infrastructure such as water, electricity, gas, and heat, accelerate the progress of various supporting construction of transportation stations, carry out special rectification actions of the "four major orders" of environment, transportation, cultural tourism, and market operation, and comprehensive improvement of the "one district and six lines" environment, and do a good job in landscape layout.

Read on