Dragon and Tiger Network News (Correspondent Li Qiaohong Kong Lingqian Reporter Xu Bowen) Recently, the Caotang River Dredging Project, a water system connection project in Gucheng Street, Gaochun District, is under intensive construction.

At the site of the Caotang River dredging project, large excavators wielded long arms in the middle of the river to work nervously, wooden stakes were pushed into the silt one by one, workers either wielded shovels or moved stones, and the on-site construction was carried out in an orderly manner. It is worth mentioning that during the construction process, Goseong Street carried out a comprehensive fence along the construction site to ensure that safety measures were in place.
It is understood that the Gaochun District Gucheng Street Water System Connection Project is a district-level key project, the scope of the project involves Caotang, Yibao, Huamiao, Xiushan, Xingang and other villages, of which Caotang River dredging is an important part of the water system connection project, dredging length of 3 kilometers, earthwork 300,000 square meters, which also includes slope protection, construction of landscape belts and other projects. The general branch of the party in Caotang Village, Gucheng Street, deployed in advance, set up a special working group to walk the fields and ridges, and strive to fully dredge the Caotang River through the water system connection project.
Yang Qilong, a villager in the Caodong Group who lives by the Caotang River in his 70s this year, saw the dredging of the Caotang River and said with emotion: "The Caotang River is the mother river of the Caotang people, and we hope to see the clear river water as soon as possible. ”