laitimes

The first case in Tai'an! Feicheng City issued the first comprehensive permit for the construction of simple and low-risk projects for social investment

author:Lightning News

Qilu Network Lightning News November 19, November 16, Tai'an Fei City Administrative Approval Service Bureau issued the "Notice of Engineering Construction Permit for Simple and Low-risk Projects" to Zhonglian Nuowei (Shandong) Magnetic Materials Co., Ltd., which is not an ordinary license, but integrates all the construction procedures of the company's standardized plant project from project establishment to construction permit, and all of them are completed within 1 day, which is also the first comprehensive license for simple and low-risk project construction of social investment in Tai'an City. It marks a major breakthrough in the reform of the examination and approval system for engineering construction projects in Feicheng City.

The first case in Tai'an! Feicheng City issued the first comprehensive permit for the construction of simple and low-risk projects for social investment

According to the common approval process for engineering construction projects, the procedures for obtaining the start of construction need to go through three stages of project land, planning permission and construction permit, handle more than 20 approval procedures, and take 15 working days to handle the parallel processing, while the approval of simple and low-risk projects for social investment in Feicheng City only runs one window, only one certificate, and only one day.

The first case in Tai'an! Feicheng City issued the first comprehensive permit for the construction of simple and low-risk projects for social investment

The Feicheng Municipal Party Committee and Municipal Government attach great importance to deepening the reform of "decentralization and management of services" and optimizing the business environment, vigorously promote the reform of the approval system for engineering construction projects, led by the administrative examination and approval service department, and closely cooperated with the departments of natural resources, housing construction, planning and other departments, formulated the "Implementation Plan for Further Standardizing and Improving the Service Level of Handling Building Permits in Feicheng City" and the "Measures for the Management of Simple and Low-risk Project Permits for Social Investment in Feicheng City", and standardized the whole process of approval of simple and low-risk projects for social investment into engineering construction permits, joint supervision and inspection, There are 3 links of joint completion and acceptance, each link is integrated into 1 matter, and the operation mode of "one system, one set of mechanisms, one window, one form, one guide, and one good job" is implemented. The first is the whole process of online approval. Relying on the "Tai'an Engineering Construction Project Approval System" to increase the special approval module, strengthen the application of electronic signatures, electronic seals, electronic certificates, and electronic materials, and improve the convenience of online handling by market entities. The second is to inform the commitment of the whole process. Formulate and publish a list of commitments and exemptions for approval in the whole process, clarify specific requirements, and after the enterprise meets the conditions for starting construction and makes a written commitment, it will directly issue the "Comprehensive Permit for Engineering Construction", and the project can start construction. The third is the "zero cost" of the whole process. Low-risk projects are exempt from various fees such as comprehensive supporting fees and special supporting fees for urban infrastructure, real estate registration fees, and compensation fees for soil and water conservation, and the fees for intermediary services such as whole-process surveying and mapping and geotechnical surveying are included in the government's purchase of services. The fourth is the whole process of agency services. Set up a "Tao Xiaomei" agency service team, adopt early intervention, pre-approval counseling, tailor-made, and full-process agency methods to provide "butler-style" professional services for the whole life cycle of construction projects.

The first case in Tai'an! Feicheng City issued the first comprehensive permit for the construction of simple and low-risk projects for social investment

Optimizing the service level of building permit approval for simple and low-risk projects for social investment is the key task of our province's breakthrough action to optimize the business environment this year, and Feicheng City has always adhered to the "user thinking", continued to deepen process reengineering, promoted institutional innovation, and focused on creating a new highland for the business environment with the shortest process, the highest efficiency, the lowest fee, the best effect, and the strongest sense of market players. On the basis of improving the system and strengthening measures, the Feicheng City Administrative Examination and Approval Service Bureau has actively carried out first-mover trials, effectively transformed the plan into a case, solidified the case into a practice, and solidly promoted the implementation of the reform. In addition to the projects that have been completed and issued, there are currently 7 projects that are carrying out pre-approval counseling and informing commitments, and the approval of simple and low-risk projects for social investment in Feicheng City has entered the fast lane of "integrated office" and "minimalist office".

Lightning News reporter Wang Xun reported from Tai'an

Read on