laitimes

The railway department carried out snow removal operations, and the station started the snow melting of electric turnouts

Beijing News Express (reporter Pei Jianfei) In order to cope with the snowfall weather, the Beijing railway department is carrying out snow removal operations, and the station dynamically starts the electric turnout according to the real-time situation of snowfall, melts the snow, and increases the inspection efforts.

According to the Beijing Railway Bureau, on November 7, the snowfall caused the Beijing-Tianjin Intercity, Beijing-Shanghai High-Speed Railway, Tianjin-Qinzhou High-Speed Railway, and Tianjin-Baoke Special Train to be delayed or suspended. Please pay attention to the station announcement or the railway 12306 website for details and make proper travel arrangements.

Last night and this morning, Beijing South Railway Station took a number of measures to ensure the stable and smooth transportation and passenger travel safety in snowy weather.

According to the real-time situation of snowfall, dynamically start electric turnouts and do a good job of snow melting; carry out snow removal in time in areas such as entrances and exits, platforms, etc.; the station arranges special personnel to strengthen the publicity, guidance and help in key places such as elevators, platforms, and access to stations to ensure that passengers can take and descend in an orderly manner and prevent slippage and fall injuries; the station increases the inspection of all pipeline heating equipment to prevent pipeline frost cracking. At the same time, the real-time monitoring of the temperature in the waiting room is strengthened, and the air conditioning system of the station is fully utilized to create a warm and comfortable waiting environment for passengers.

Last night and this morning, as the snow increased, in order to ensure the safety of passengers, Beijing West Railway Station timely spread snow melting agents for operation channels, turnouts, platforms and other places, clean up the snow, and find that the ice situation was dealt with in time. The station also placed anti-slip mats at the entrance and enhanced safety broadcast prompts.

The railway department carried out snow removal operations, and the station started the snow melting of electric turnouts

Employees at Beijing West Railway Station clear snow from the platform on November 7. Photo by correspondent Xu Qiang

As the first to experience snowfall, the Beijing-Zhang high-speed railway is also running in an orderly manner.

From November 5th to 6th, zhangjiakou area suffered heavy snow and extremely cold cooling weather, Zhangjiakou engineering section immediately launched the Beijing-Zhangjiakou high-speed rail emergency plan, and quickly organized the Beijing-Zhangjiakou high-speed rail emergency duty personnel to use snow removal equipment such as blowers to clean up snow from key equipment in the turnouts of the station under the pipe, such as Garden North, Zhangjiakou and Prince City. At the same time, according to the weather and on-site conditions, special personnel are arranged to keep an eye on the snow cover in the turnout area, and organize personnel to repeatedly clean up the snow in key parts to ensure the safe and smooth flow of the Beijing-Zhang high-speed railway.

The Beijing Engineering Section immediately launched a wind and snow removal plan, organized cadres and workers to resolutely dismantle structures that endanger traffic safety such as color steel houses along the high-speed railway, organized more than 300 employees to continuously carry out snow removal operations on turnouts and other places, and periodically sprayed antifreeze to ensure that the line equipment was in good condition.

Beijing News reporter Pei Jianfei

Edited by Zhang Lei, Proofreader Zhao Lin

Read on