Shoot real! The primary school in Danyang is about to be completed with a total investment of 130 million yuan
author:Happy living in Danyang
Education has always been the most important concern of parents
It is also an important people's livelihood project
Today Xiaobian actually explored Danyang under construction
Ma Xiangbo Primary School
Let's take a look at the latest developments
Ma Xiangbo Primary School is located on the west side of Qiliang Road in the development zone and south of the Danyang Municipal Procuratorate, with a planned total investment of 130 million yuan and a total construction area of 30,000 square meters.
The overall teaching building is very modern in style, with red and white as the main tone, giving people a sense of majestic atmosphere.
NO.1| Integrated teaching building
Walking into the comprehensive teaching building, you will be greeted by a model of the theme of the universe.
The Cosmic Starry Sky Planetarium allows students to explore the mysteries of the universe here.
There is also a model of a "space capsule" hidden here.
The comprehensive classroom of Ma Xiangbo Primary School is really beautiful, and each classroom corresponds to each subject and is specially created to give students a different experience.
Do you know what subjects these classrooms are? Do you have any heart?
NO.2| Modern library
The library as a whole is magnificent and atmospheric, and the ancient style is azure. The symmetrical shape of the central axis sets off its steady and rigorous style, and under the background of the calm color, it is like the crown belt of ancient Hongru, highlighting the study style of self-improvement and elegance and tranquility for scholars. The transparent and fast glass curtain wall is perfectly combined with the calm building body shape, which means the integration of ancient and modern, learning crown Chinese and foreign.
NO.3| Classrooms and surrounding activity areas
Teaching equipment, desks and chairs, and supporting daily necessities are all in place in each classroom.
Classrooms with clean windows, a wide and open range of activities between classes, adequate safety protection measures, each of which reflects rigorous details.
NO.4| Playground and supporting facilities
The whole playground adopts the latest environmental protection standards, and the fitness equipment is diverse, which fully meets the daily activity needs of students.
The playground part is almost complete, and only a few fitness equipment is still being built and assembled.
Aerial view of the project project
The project is a 10-track primary school that began construction in March 2020 and will renovate and expand the original technical school, with a single comprehensive teaching building, a teaching building, a library and information building, a sports center, and a canteen, which can accommodate 3,000 students in 60 classes.
At present, the project has entered the final stage and is expected to be put into use at the end of this year, which will greatly alleviate the problems of large schools and large classes in the new district and experimental schools.
The commissioning of the new school will be able
Greatly alleviate the problem of teaching pressure in the development zone
Compulsory education for the children of the surrounding citizens