laitimes

Wang Runze, assistant to the president of Nangang Steel, and his party went to the metallurgical branch of Nangang Steel to inspect and guide the work

author:Art says property market

On October 23, Wang Runze, assistant to the president and director of the manufacturing department of Nangang Steel, Wang Libin, director of the raw material factory, Hu Yongman, director of the company, and other company leaders went to the construction site of the C2 silo of Nangang Steel Co., Ltd. to inspect and guide the construction site of the environmental protection closed construction and security project of the metallurgical branch, understand the project situation, and comfort the employees who are fighting in the front line of the project.

At the project site, Wang Runze repeatedly emphasized the construction safety work, the site operation content is many, the level is wide, the safety precautions must be implemented in detail, the safety measures must be in place for each work, and the major sources of danger and risk control points must be implemented one by one, checked one by one, leaving no hidden dangers and no dead ends. While ensuring safety, it is also necessary to improve environmental awareness, and the treatment of on-site soil should be properly handled, and must not cause harm to the environment. When talking about the work of concrete pouring and axis penetration, Wang Runze stressed: It is necessary to grasp the nodes, control points, precise planning, and close cooperation to ensure that there is no omission. At the same time, the on-site physical quality, project progress, safety management and so on of the metallurgical branch are highly evaluated!

Project leader Fan Caihong thanked the leaders of Nangang Steel for their concern and support and said: Erye, as a large central enterprise, the project department of Nangang will attach great importance to safety and quality control, check and fill in the gaps, implement to people, strive to improve the level of project management, strengthen quality control, lay a solid foundation for this cooperation, continue to carry forward the enterprise spirit of Erye "no delay in one day, no slack in one day", and ensure that the project is fulfilled as scheduled. At the same time, do a good job in environmental protection work, and maximize the efficiency of the project on the basis of quality and quantity!

Read on