"Unexpectedly, the mountain road was really repaired to the doorstep, which is amazing!" Recently, Li Maopeng, a villager in the 4th group of Liangzihe Village in Shalizhai Town, Fengcheng City, cleaned up his courtyard, glanced at the newly built cement road in front of his home from time to time, and praised, "The CPPCC proposal has solved a big problem for us!" ”
In the past few days, when talking about this cement road that has just been built, the four groups of villagers have closed their mouths happily. Liangzihe Village is located in the mountainous area, relying on the mountains to eat the mountains, the main industry in the village is tulip silkworms, cashmere goats, black pigs and peanuts, chestnut cultivation. A 300-meter winding mountain road is the only way for 4 groups of villagers to go up the mountain to work, it is difficult to walk in the mud on rainy days, it is difficult to walk on sunny days, and the road is closed by ice and snow in winter, and more than 20 villagers are extremely inconvenient to travel. "At the beginning, this mountain road was not included in the 'group communication' of the transportation department, and Liangzihe Village is a poor village, and it is really unable to solve it by itself." Li Shilong, secretary of the village branch, introduced.
At the beginning of this year, the problem of difficult roads in 4 groups of Liangzihe Village was reflected in the Municipal Cppcc Committee. Researchers from the Proposal Committee of the Municipal Committee of the Chinese People's Political Consultative Conference went to the village to investigate, find out the situation, and wrote and put forward a proposal "Suggestions on Solving The Traffic Difficulties of Travel and Operation for Poor Villagers", suggesting that relevant departments build convenient roads as soon as possible. After the proposal is signed and approved by the municipal government, it is handed over to Fengcheng City for specific handling. After learning about the villagers' practical difficulties, the Fengcheng City Poverty Alleviation Office and the Transportation Bureau coordinated 50,000 yuan to start road surveying, design, bidding and construction in early June. After three months of construction, a cement road with a length of 300 meters and a width of 3.5 meters was completed.
"The cement road is paved, and it looks like it can be opened up." Villager Zhao Hong sighed, "This road has been repaired to the hearts of the villagers. ”
*The relevant content of this website is reproduced from a legally authorized website, if you believe that the reproduced content infringes your rights and interests,