
In order to improve the quality of greening along the roads in Xinzhou District, effectively improve the people's livelihood environment and improve the satisfaction of the masses, Xinzhou District will carry out greening upgrading and transformation from Lingxi to New 320 National Highway (Xinzhou Section) of Wuchu Avenue at the end of November. The main content of the upgrading and renovation project: the road lighting, the nodes on both sides of the road and the greening of the shoulders of the 1-meter-wide dirt road on both sides of the Wuchu Avenue (Xinzhou Section), with a total area of about 16,450 square meters, a length of about 1 kilometer, and an investment amount of about 5 million yuan. Renovation time: Construction is scheduled from the end of November 2021 and is expected to be completed on January 30, 2022.
Scope of the transformation
From Lingxi to New 320 National Highway, Wuchu Avenue, Xinzhou District, is about 1 km long and has a total area of about 16,450 square meters.
Location analysis
Status quo analysis
"Renovation Renderings"
▼
Editor: Qiu Jun
Reviewed by: Guo Rui
Source: Xinzhou Chengguan