laitimes

Occupy the road construction! Dongsheng is a complete elementary school, the south gate of the park, and the food street are →

Occupy the road construction! Dongsheng is a complete elementary school, the south gate of the park, and the food street are →

Announcement of road occupation construction

(a)

Due to the construction of the overpass in Dongsheng District, the unloading of steel structure materials, in order to ensure the safety of vehicles and personnel, the road section needs to be closed in one direction, and the announcement is as follows:

1. Closed construction section: half of the road from east to west in front of the first primary school of Etuoke East Street

2. Closed construction time: 8 a.m. to 11:30 a.m. on September 13, 2024

3. Detour route: It is recommended that vehicles traveling from east to west of Etuoke East Street turn right through Hangjin Road or turn right through Dalat North Road in advance; Heading south from the North Gate Gas Station on Dalat North Road, vehicles can choose to go straight or turn right.

During the closure construction period, all vehicles and pedestrians are not allowed to pass in the area except for engineering construction vehicles. It is hoped that the general public can pay attention to the road condition information in a timely manner (Sina Weibo @ Dongsheng Traffic Police), actively cooperate, choose a detour in advance, and obey the command of the on-site personnel. We ask for your understanding and understanding for any inconvenience caused to the public during the construction period.

The announcement is hereby made

Ordos Shengshi Media Co., Ltd

Dongsheng District Brigade of the Traffic Management Detachment of the Ordos Public Security Bureau

September 12, 2024

Closure of construction sections

↓↓↓

Occupy the road construction! Dongsheng is a complete elementary school, the south gate of the park, and the food street are →

Announcement of road occupation construction

(b)

Due to the emergency repair of the urban drainage pipe network water damage, in order to ensure the safety of social vehicles and personnel, the following road sections need to be closed for one-way construction, which is hereby announced as follows:

1. Closed construction section: half of the road from the west to the east of the south gate of Yikezhao Park, Taohai East Street, Baori

2. Closed construction time: from 9 a.m. on September 15, 2024 to 18 a.m. on September 16, 2024

3. Detour route: Vehicles traveling from west to east will be separated by the northern half of the road, please drive cautiously to ensure safety.

During the closed construction period, except for the construction vehicles, all vehicles and pedestrians are not allowed to pass in the closed area. It is hoped that the general public can pay attention to the road condition information in a timely manner (Sina Weibo @ Dongsheng Traffic Police), actively cooperate, choose a detour in advance, and obey the command of the on-site personnel. We ask for your understanding and understanding for any inconvenience caused to the public during the construction period.

The announcement is hereby made

Municipal Service Center of Dongsheng District, Ordos City

Dongsheng District Brigade of the Traffic Management Detachment of the Ordos Public Security Bureau

September 12, 2024

Closure of construction sections

↓↓↓

Occupy the road construction! Dongsheng is a complete elementary school, the south gate of the park, and the food street are →

Announcement of road occupation construction

(c)

Due to the renovation of the heating pipe network in the old city, in order to ensure the safety of social vehicles and personnel, the following road sections need to be occupied for construction, which is hereby announced as follows:

1. Closed construction section: The T-shaped intersection of Minsheng Square Food Street occupies one lane in the east-west direction, leaving only one lane for traffic, please drive cautiously and give way to each other.

2. Closed construction time: from 9 a.m. on September 14, 2024 to 18 a.m. on September 17, 2024

3. Detour route: It is recommended that vehicles leaving the urban area exit Hangjin Road or Dalat Road through this section of the road and turn around

During the closed construction period, except for the construction vehicles, all vehicles and pedestrians are not allowed to pass in the closed area. It is hoped that the general public can pay attention to the road condition information in a timely manner (Sina Weibo @ Dongsheng Traffic Police), actively cooperate, choose a detour in advance, and obey the command of the on-site personnel. We ask for your understanding and understanding for any inconvenience caused to the public during the construction period.

The announcement is hereby made

Ordos Dongsheng District Huihe Heating Co., Ltd

Dongsheng District Brigade of the Traffic Management Detachment of the Ordos Public Security Bureau

September 12, 2024

Occupy the road construction section

↓↓↓

Occupy the road construction! Dongsheng is a complete elementary school, the south gate of the park, and the food street are →

Source: Dongsheng Traffic Police

Editor: Li You

Proofreader: Liu Jinglu

Review: Yang Yang

Final review: Wang Hongmei

Occupy the road construction! Dongsheng is a complete elementary school, the south gate of the park, and the food street are →

Read on