laitimes

Take a detour in advance! Dongsheng these sections of the road are closed for construction

Take a detour in advance! Dongsheng these sections of the road are closed for construction

Announcement on Closed Construction (1) Due to the construction of sewage pipeline renovation, in order to ensure the safety of social vehicles and personnel, the following roads need to be semi-closed for construction, which is hereby announced as follows:

1. Closed construction scope: Half of the road from the intersection of Jungger North Road and Etuoke East Street in Dongsheng District to the intersection of the West Ring Road of the park and Etoke is closed to the west

Take a detour in advance! Dongsheng these sections of the road are closed for construction

2. Closed construction time: from 9 o'clock on October 20 to 18 o'clock on November 10

3. Detour route: It is recommended that vehicles on the north gate section of the park detour through Manduhai Lane to detour to Minzu Street or through the West Ring Road of the park to Baori Taohai East Street

During the closure construction period, all vehicles and pedestrians are not allowed to pass in the area except for engineering construction vehicles. It is hoped that the general public can pay attention to the road condition information in a timely manner, actively cooperate, choose a detour in advance, and obey the command of the on-site personnel.

The announcement is hereby made

Ordos Dongsheng Water Engineering Construction Co., Ltd., Dongsheng District Brigade, Traffic Management Detachment, Ordos Public Security Bureau, October 18, 2024

Announcement on Closed Construction (2) Due to the construction of sewage pipeline renovation, in order to ensure the safety of social vehicles and personnel, the following roads need to be closed for construction, which is hereby announced as follows:

1. Closed construction scope: about 500 meters north of the south end of the road in Dongsheng District

Take a detour in advance! Dongsheng these sections of the road are closed for construction

2. Closed construction time: from 9 o'clock on October 20 to 18 o'clock on November 10

3. Detour route: It is recommended that residents detour to the nearby self-built road in advance

During the closure construction period, all vehicles and pedestrians are not allowed to pass in the area except for engineering construction vehicles. It is hoped that the general public can pay attention to the road condition information in a timely manner, actively cooperate, choose a detour in advance, and obey the command of the on-site personnel.

The announcement is hereby made

Ordos Dongsheng Water Engineering Construction Co., Ltd., Dongsheng District Brigade, Traffic Management Detachment, Ordos Public Security Bureau, October 18, 2024

Source: Dongsheng Traffic Police

Editor: Guo Na

Proofreader: Li You

Review: Yang Yang

Final review: Wang Hongmei

Read on