laitimes

Pilot in 10 pilot areas in the city! Wanzhou was selected as a →

author:Micro Wanzhou

recently

Vehicles in the public sector in Chongqing

The pilot of the comprehensive electrification pilot zone will be announced to the public,

Wanzhou was selected as a pilot,

Become one of the city's 10 pilot pilot areas,

will promote industrial upgrading,

Help citizens enjoy a green life.

Wanzhou was selected as a pilot

November 2023

Ministry of Industry and Information Technology,

Issued by 8 departments including the Ministry of Transport

"On the launch of the first batch of vehicles in the public domain

Notice on the Pilot of the Comprehensive Electrification Pilot Zone,

Fifteen cities were identified as the first batch of pilot cities.

Chongqing was not only selected as one of the first batch in the country

Pilot area for full electrification of vehicles in the public domain,

Moreover, it has become one of the five first-class pilot cities in the country.

Pilot in 10 pilot areas in the city! Wanzhou was selected as a →

forthwith

The Chongqing Municipal Economic Information Commission is within the city

Start public domain vehicles

The pilot review of the comprehensive electrification pilot zone.

Pilot in 10 pilot areas in the city! Wanzhou was selected as a →

Reporter: Hu Jiaxing

Passed the document review,

In the defense session, 10 pilot areas were reviewed.

It is proposed to combine Yubei District, Beibei District, Jiulongpo District,

Nan'an District, Liangjiang New District, Wanzhou District,

Fuling District, Wulong District, Tongliang District,

Yongchuan District was included in the pilot scope,

And recently announced to the public.

Pilot in 10 pilot areas in the city! Wanzhou was selected as a →

Reporter: Chen Min

It is understood that

Chongqing will start from "comprehensively promoting the process of vehicle electrification,

Improve the construction of charging and swapping infrastructure,

Promote the innovative application of new technologies and new models,

Optimize and improve the policy guarantee system"

and other four aspects,

It is planned that by 2025, it will be built with distinctive features,

Vehicles in the public sector with a sound system and innovative development

fully electrified pilot cities,

More than 240,000 charging piles have been built.

200 battery swap stations,

The formation of a wide coverage, moderate scale,

High quality with reasonable structure and perfect function

Charging and swapping infrastructure system.

Reporter: Xie Shurui

Editors: Fan Qing, Tan Mengna

Editors: Tan Changming, Yang Yuangang