laitimes

The northern section of Union 4th Road has been potholed for a long time, and the Housing and Urban-Rural Development Bureau: It will be closed for construction and transformation

author:Two or three miles of information

On May 13, some citizens reported to Huashang Daily-Ersanli Information that there were multiple potholes in the northern section of Union 4th Road in Qindu District, causing bumps in passing vehicles and inconvenience to passing pedestrians. In response to this matter, the relevant staff of the Housing and Urban-Rural Development Bureau said that the road will be closed for construction in the near future.

The road surface is damaged and seriously affects the traffic, and the Housing and Urban-Rural Development Bureau: It will be closed for construction in the near future

The northern section of Union 4th Road has been potholed for a long time, and the Housing and Urban-Rural Development Bureau: It will be closed for construction and transformation

On May 13th, the reporter came to the northern section of the Union Fourth Road that the citizens said, and saw that the road pavement was relatively seriously damaged, with more potholes of all sizes, and the traces of pavement repair were also clearly visible.

The northern section of Union 4th Road has been potholed for a long time, and the Housing and Urban-Rural Development Bureau: It will be closed for construction and transformation

"When the house was handed over in 2022, the developer said that the road at the entrance of the community would be handed over to the Xianyang Municipal Bureau of Housing and Urban-Rural Development for repair, and the road surface was repaired at the beginning of 2024, but only the larger pit was simply treated with asphalt, and the road surface was still potholed, and a guardrail was added in early May, but there has been no movement until now." The owner of Rongsheng Jinxiu Guandi Rongyuan Community said.

Mr. Zhang (not his real name) said: "Many roads in Xianyang City are being renovated, but Union No. 4 Road seems to have been forgotten and has not been repaired. ”

The reporter also inquired about several businesses on the side of the road at the same time, "This road was like this last year, and no one has been in charge of it." The owner of a nearby shop told reporters.

The northern section of Union 4th Road has been potholed for a long time, and the Housing and Urban-Rural Development Bureau: It will be closed for construction and transformation

In response to this situation, the reporter contacted the Xianyang Municipal Housing and Urban-Rural Development Bureau Road and Bridge Construction Section, the staff said that the Union Fourth Road is the section of the road that will be diverted from rain and sewage in the urban construction plan last year, and has now communicated with the traffic police department, and will be closed for road construction in the near future.

Huashang Daily reporter Wei Xiaoning Editor Guo Cheng Lan Xin

Read on