laitimes

It is expected to be completed and put into use in June!

author:Ma'anshan release

recently

The reporter walked into the Yanghu area

Underground comprehensive pipe gallery project

The construction site of the No. 4 working shaft

It's a busy scene

The project is expected to end May this year

Completed all line relocation and reconstruction projects

In June, the construction of auxiliary facilities in the pipe gallery was completed

Subsequently, it was officially put into use

It is expected to be completed and put into use in June!

In 2022, in order to build a "mountain-water-city-station" urban living room in Yanghu area, Ma'anshan City will take the lead in launching the underground comprehensive pipe gallery construction project in the province, and transform the existing high-voltage overhead lines within the scope of Cihuhe Road in the east, Pingshan Road in the west, Caishihe Road in the south, and Jiuhua Road in the north.

It is expected to be completed and put into use in June!

The project mainly involves the relocation and transformation of 6 220 kV overhead lines within the above-mentioned range, and the construction content includes overhead line relocation and reconstruction engineering, construction engineering, tunnel engineering, cable electrical engineering, installation engineering and related ancillary projects.

It is expected to be completed and put into use in June!

The total length of the underground comprehensive pipe gallery in Yanghu area is about 4,000 meters, and there are 9 working wells, of which the underground depth of the pipe gallery is 5 to 6 meters, and the underground of the working well is three layers, with an average depth of 15 meters and a maximum depth of 18 meters.

It is expected to be completed and put into use in June!

The second basement floor is the comprehensive cabin of the pipe gallery line, and the wall is a neatly arranged cable frame. The basement floor is specially equipped with a comprehensive pipe gallery control center, which can be automatically inspected in the future with the help of infrared thermal imaging equipment, inspection robots, digital maps, etc.

Good article recommendation:

1. This mountain is of great significance to the people of Ma'anshan!

2. The GDP growth rate is the first in the city! What does Ma'anshan Economic Development Zone rely on?

3. Ma'anshan, what is the future space geometry?

Trainee reporter Huang Xiaomin Correspondent Wang Yong

Editor: Wang Xinyi Proofreader: Fu Zhongping