laitimes

Erguang high-speed construction, please pay attention to vehicles!

author:Xinzhou Net
Erguang high-speed construction, please pay attention to vehicles!
Erguang high-speed construction, please pay attention to vehicles!

Notice on the construction of the road section under the jurisdiction of the five detachments and four brigades of the high-speed G108 Xinzhou The reconstruction and expansion project of the Shahe to Shilingguan section in Xinzhou crosses the 623km + 902m cross-line bridge construction of the main line of the G55 Erguang Expressway, which is scheduled to be carried out from May 13 to September 23, 2024. In order to ensure the progress of the construction and ensure the safety of traffic, according to the construction arrangement and schedule, the traffic control measures of borrowing and protecting the road will be taken on the section of 623km + 380m to 624km + 870m 2 kilometers south of the Laoyang exit of the main line of the Erguang Expressway within the jurisdiction of the five detachments and four teams of the expressway. The announcement is as follows: 1. From May 13th to July 20th, vehicles heading to Datong will borrow the main line in the direction of Taiyuan; From July 21st to September 23rd, vehicles heading to Datong drove normally. 2. From May 13th to September 23rd, vehicles heading to Taiyuan will resume driving on the main line after detouring through Baotong Road. Please make travel plans in advance, arrange travel routes reasonably, pass in an orderly manner in accordance with traffic signs and information forecasts, and obey the command and management of on-site high-speed traffic police, road administration and construction personnel. We apologize for the inconvenience caused by the construction and thank you for your support.

Five detachments and four brigades of high speed

May 10, 2024 Source: Shanxi Expressway Traffic Police Detachment No. 5

Erguang high-speed construction, please pay attention to vehicles!

Read on