laitimes

The Qilihe District Landscaping Institute actively carried out the replanting of street trees

author:Seven Mile River release

In order to further improve the quality of green space landscape, solve the problem of empty tree holes in the main and secondary roads. At the end of March, the Qilihe District Landscaping Institute actively carried out the replanting and replanting of street trees, and has replanted a total of 463 street trees such as acacia and ash on more than 20 main and secondary roads in the district.

The Qilihe District Landscaping Institute actively carried out the replanting of street trees

Comprehensive investigation does not omit anything. In order to ensure that the street tree replanting is not omitted, the district landscaping department organized personnel to pull the net for each road empty tree holes and dead trees, and at the same time matched the seedlings allocated by the Municipal Forestry Bureau according to the tree species and specifications, and scientifically and reasonably formulated the replanting and replanting plan.

The Qilihe District Landscaping Institute actively carried out the replanting of street trees

The replanting process is strictly demanding. In order to ensure the quality of street tree replanting, the staff is required to operate in strict accordance with the standard process of digging seedlings, loading and unloading, lifting, planting and other links, and at the same time do a good job of various safety measures when planting, and arrange special personnel to guide and inform the parked vehicles and citizens to eliminate potential safety hazards.

The Qilihe District Landscaping Institute actively carried out the replanting of street trees

The post-maintenance is not relaxed. After the planting work is completed, it is necessary to strictly abide by the requirements of fine maintenance, and do a good job in the arrangement of the holes, watering, and pest control of the newly planted street trees in an orderly manner to ensure that one tree is planted and one survives. At present, the Municipal Forestry Inspection Station has completed the inspection of the replanting and replanting of street trees in Qilihe District.

The Qilihe District Landscaping Institute will continue to focus on replanting and greening, strive to overcome the difficulties of summer replanting, and do a good job in summer maintenance work with high standards and high quality, so as to "increase the amount of greenery, improve the quality and add power" to the development of the city.

Correspondent: Ren Jing Editor: Jia Lina Review: Chen Yaling

Job

Read on