laitimes

Roads were blocked, power supply was cut off, and they dispatched Safety

author:Micro will be happy
Roads were blocked, power supply was cut off, and they dispatched Safety
Roads were blocked, power supply was cut off, and they dispatched Safety
Roads were blocked, power supply was cut off, and they dispatched Safety

Affected by continuous heavy rainfall

Today

Heavy rain in Jiangle County

Locally accompanied by grade 8 or above

Thunderstorms and strong winds, short-term heavy precipitation, hail

and other severe convective weather

All relevant departments take the initiative

Be proactive

Act quickly to keep roads clear

Race against time to repair and ensure power supply

……

Roads were blocked, power supply was cut off, and they dispatched Safety

In the morning, there was a large area of water accumulation in the section of Wenbo Town on Leyuhua Avenue, causing many vehicles to break down and affecting the normal passage of traffic.

Roads were blocked, power supply was cut off, and they dispatched Safety

The traffic police brigade, highway bureau and other departments responded quickly, dispatched excavators and other large equipment to the scene to remove debris and silt and dredge ditches. Workers use iron bars, shovels and other tools to pry open the rainwater manhole cover plate to quickly remove the internal silt and debris. As of 11:30, the Wenbo Town section of Yuhua Avenue resumed traffic.

Morning

Some sections of the 10kV Yangyuan line were damaged

It seriously affects the normal life of residents

State Grid Jiangle County Power Supply Company

Quickly organize a repair team to rush to the scene

Carry out emergency repair work

Roads were blocked, power supply was cut off, and they dispatched Safety

It is understood that the damaged 10kV Yangyuan line mainly includes 903#116-#117杆段和#122-#123杆段. Among them, the former has the situation of tree pressure wire and wire winding, and the latter has the fault of tree pressure wire disconnection. In the face of the complex emergency repair environment, the State Grid Jiangle County Power Supply Company immediately launched the emergency plan, deployed professional emergency repair personnel and materials and equipment, and went all out to carry out the emergency repair work.

Roads were blocked, power supply was cut off, and they dispatched Safety

Up to now, the State Grid Jiangle County Power Supply Company has dispatched 42 emergency repair personnel and 8 emergency repair vehicles to make every effort to rush through the damaged lines. At present, the electricity supply has returned to normal.

Source: County Financial Media Center Comprehensive Editor: Li Ping Preliminary Review: Xiong Ruqing Review: Zou Guanchang Final Review: Xiao Jiuhui Business Cooperation, News Clues, Combat Fake News Reporting: 0598-2322923 Submission Email: [email protected]

Roads were blocked, power supply was cut off, and they dispatched Safety
Roads were blocked, power supply was cut off, and they dispatched Safety

Is there anything you have to tell the editor?

Come to the interactive area and leave a message!

No!?

Roads were blocked, power supply was cut off, and they dispatched Safety

"Okay?

Read on