(1) System structure requirements

The system consists of polystyrene board, adhesive and, if necessary, anchor bolts, plastering glue (thin plaster, anti-crack mortar) and alkali-resistant fiberglass mesh and coatings.

In 2024, the second-level constructor building pure gold test center EPS plate thin plastering system, the second construction must test center

(2) The polystyrene board should be pasted firmly, and the adhesive area should not be less than 40% of the area of the polystyrene board. (3) The polystyrene board at the corner of the wall should be staggered and interlocked.

The polystyrene board at the four corners of the door and window openings should be cut and formed by the whole board, and the joints should be at least 200mm away from the corners.

(4) After the polystyrene board is firmly bonded, install the anchors as required, and the anchorage depth is not less than 25mm.

(5) The ground floor is 2m high from the outdoor ground and the decorative joints, the four corners of doors and windows, the yin and yang corners and other parts that may be subjected to impact force must be laid with reinforcing nets.

In 2024, the second-level constructor building pure gold test center EPS plate thin plastering system, the second construction must test center

3) Rubber powder EPS particle insulation mortar system

(1) System structure requirements

The rubber powder EPS particle insulation mortar system is composed of an interface layer, a rubber powder EPS particle insulation slurry insulation layer, an anti-crack mortar thin plastering surface layer, a glass fiber mesh and a finish.

In 2024, the second-level constructor building pure gold test center EPS plate thin plastering system, the second construction must test center

4) On-site physical inspection of the envelope structure (P165)

(2) The on-site physical inspection of the energy-saving structure of the building exterior wall shall include the type of wall insulation material, the thickness of the insulation layer and the insulation structure practice.

(4) The core drill inspection of the energy-saving structure of the exterior wall shall be witnessed by the supervising engineer, which can be carried out by a qualified testing agency entrusted by the construction unit or by the construction unit.

(5) When the heat transfer coefficient or thermal resistance of the exterior wall is inspected, it shall be witnessed by the supervising engineer and implemented by the qualified testing agency entrusted by the construction unit;

1. [Classic Past Question] The exterior wall insulation adopts EPS board thin plastering system, which is composed of EPS board, alkali-resistant glass fiber mesh, adhesive, thin plastering surface layer, finishing coating, etc., and its structural diagram is as follows.

Problem: Write out the names of each construction method shown by the numerical code in the figure.