laitimes

Ensuring safety and promoting development, disaster prevention and mitigation are close to the people

author:See Qionglai

In order to make every effort to deal with the flood prevention and ground disaster prevention and control work of the first round of rainy weather in 2024, effectively protect the safety of the lives and property of the people, and promote the high-quality social and economic development of our city, on April 16, the Municipal Flood Control and Drought Relief Headquarters Office and the Municipal Geological Disaster Command Office jointly held the first round of rainy weather process disposal and response work meeting in 2024. The Municipal Planning and Natural Resources Bureau, the Municipal Housing and Urban-Rural Development Bureau, the Municipal Comprehensive Administrative Law Enforcement Bureau, the Municipal Transportation Bureau, the Municipal Water Affairs Bureau, the Municipal Culture and Tourism Bureau, the Municipal Emergency Bureau, the Municipal Meteorological Bureau, and relevant comrades from 14 towns (streets) attended the meeting.

Ensuring safety and promoting development, disaster prevention and mitigation are close to the people

The meeting conveyed and learned the spirit of General Secretary Xi Jinping's important expositions and important instructions on disaster prevention, mitigation and relief, and implemented the arrangements and arrangements for disaster prevention and mitigation in Sichuan Province and Chengdu on the current round of obvious rainfall weather process, and the Municipal Meteorological Bureau analyzed and judged the current round of rainfall and meteorological development trends in Qionglai City, and the Municipal Water Affairs Bureau, the Municipal Emergency Bureau, and the Municipal Planning and Natural Resources Bureau made comprehensive arrangements for the current round of rainfall monitoring and early warning inspections, emergency rescue preparations, and ground disaster monitoring and inspections.

Meeting Requirements:

01

It is necessary to attach great importance to and compact responsibility

Firmly establish the disaster prevention concept of "people first, life first", overcome paralysis, wake up, and do a good job in responding to the current round of rainfall in strict accordance with the requirements of the flood season.

02

It is necessary to sort out again and check for omissions and fill in the gaps

Strictly implement the pre-flood work arrangements, publicize and train drills to the smallest unit, highlight practical results, carefully sort out the problems existing in disaster prevention work, make up for shortcomings in a timely manner, and make full preparations for emergencies.

03

It is necessary to implement monitoring and do a good job of inspection

Pay attention to the rain and water conditions, strengthen point monitoring, strictly implement the requirements of "pre-rain inspection, rain inspection, and post-rain verification", and resolutely implement the rigid requirements of "three avoidances" and "three emergency evacuations".

The day after the meeting

The Municipal Bureau of Planning and Natural Resources immediately organized professional and technical personnel to carry out the verification of geological hazards after the rain in conjunction with the Tiantaishan Town Government.

Ensuring safety and promoting development, disaster prevention and mitigation are close to the people
Ensuring safety and promoting development, disaster prevention and mitigation are close to the people
Ensuring safety and promoting development, disaster prevention and mitigation are close to the people

-END-

Source: Qionglai Planning Natural Resources

Read on