Dajiang.com/Dajiang News Client News All-media reporter Xie Mengli reported: On January 26, the reporter learned that due to the construction needs of the Nan'an toll station interchange ramp of the Zhangshu-Ji'an Expressway reconstruction and expansion project, in order to ensure traffic safety, from now until 24:00 on February 3, the Nan'an toll station interchange A, B, and C ramps are fully closed.
Nan'an interconnection
The specific detour scheme is as follows:
Vehicles from the Changjin section of the Shanghai-Kunming Expressway to the Nan'an Interchange should detour at the Luofang Interchange or the Huangtugang Interchange in advance;
Vehicles from the Changzhang section of the Shanghai-Kunming Expressway to Nan'an Interchange should detour to the Huangtugang Interchange, Luofang Interchange or Changfu Interchange (Dongchang Expressway) in advance;
Vehicles from Dongchang Expressway to Nan'an Interchange should detour at Changfu Interchange (Dongchang Expressway), Huangtugang Interchange or Luofang Interchange in advance;
Vehicles from Nan'an Interchange Expressway to Ji'an direction should detour to Xiajiang Interchange or Jishui Interchange to get on the expressway;
Vehicles from Xiajiang to Nan'an, Nanchang and Zhangshu are in normal traffic.