laitimes

In the heat, he climbed to the roof of the train

In the heat, he climbed to the roof of the train

"CRH380A-2758 EMU 3 car air conditioner in the electric pre-check time high voltage fault, need to rinse the condenser after further inspection to confirm." On August 6, the outdoor temperature was 33 degrees Celsius, and the airtight maintenance depot was like a "steaming box".

In the heat, he climbed to the roof of the train

Under the "baking test" of high temperature, Yang Wenkui and his colleagues walked into the indoor EMU maintenance depot at 38 degrees Celsius and began a day of air conditioning maintenance operations.

In the heat, he climbed to the roof of the train

The "lung clearing" division of the EMU of the special rectification group of the air conditioning special rectification group in the chengdu EMU section conducts a comprehensive inspection of the air conditioning unit every day in accordance with the maintenance operation plan, confirms the replacement of the air conditioning air filter and the flushing of the condenser, completely eliminates difficult faults, and allows the air conditioner to maintain a good ventilation and cooling effect when running on the EMU line.

In the heat, he climbed to the roof of the train

Air conditioning unit inspection is carried out on the roof of the vehicle

Yang Wenkui, a "post-90s" from Gansu, is one of the "lung clearing" divisions of the EMU. At 9:15, he began to conduct an air conditioning non-power inspection of the three sets of EMUs repaired in the second level in the library to check whether the air conditioning distribution cabinet had traces of the control line being off-line or burning.

In the heat, he climbed to the roof of the train

Test the air pressure of the refrigeration line of the air conditioning unit

The CRH380A-2758 EMU has a total of two air conditioners at the end and a tail in one car, a total of 16 cars, and the whole train maintenance will take 2 hours, and he will complete all the inspection operations of the 8 air conditioning distribution cabinets in the sweltering cabin without power supply.

In the heat, he climbed to the roof of the train

At 14:30, after the end of the no-electricity inspection, Yang Wenkui and his colleagues wore raincoats, waterproof rubber shoes, and safety helmets, and began to deal with the high-voltage failure of the air conditioner. They worked with each other to disassemble the EMU baseplate and skirt plate, inspect the filter, evaporator and condenser with a flashlight, and then use a high-pressure water gun to rinse the condenser radiator.

In the heat, he climbed to the roof of the train

"If the condenser radiator is too stained, it will affect the heat dissipation effect, which may lead to high-pressure failure of the air conditioner and stop running when it is severe." Yang Wenkui carefully rinsed the strainer until the outflow became clear.

In the heat, he climbed to the roof of the train

Perform air conditioning condenser flushing

With the completion of this set of "combination punches", Yang Wenkui and his colleagues' clothes have long been soaked with sweat, and the skin has also left traces of "intimate contact" with mosquitoes in the gutter. "Although I wear a raincoat, the splash of water when washing will inevitably wet the clothes, and coupled with the heat wave around me, it feels like 'ice and fire double heaven'." Yang Wenkui said.

In the heat, he climbed to the roof of the train

Attach a seat belt

In the heat, he climbed to the roof of the train

The "lung clearers" not only need to "enter the earth", but also "go to heaven". CRH3A, CRH1A, CRH380D EMU air conditioning unit evaporator are located on the roof, in the processing of air conditioning unit evaporator failure, they need to tie the seat belt, through the maintenance of the library three-layer work platform, climb on the roof of the top air conditioning unit inspection, 6 meters height makes people a little dizzy, especially at the top of the driver's cab of the EMU, due to the proximity to the front, the top surface is sleek, they must hang the seat belt on the contact net to ensure safe operation.

In the heat, he climbed to the roof of the train

Confirm that the air conditioner is electrically available in the driver's cab

At 16:10, after the fault was handled, the EMU raised the bow power supply, the air conditioner began to operate, and the "lung clearers" entered the driver's cab to view the train monitoring screen, and confirmed whether the faulty air conditioning unit returned to normal by viewing the fault alarm function and the temperature display of each carriage. At the same time, they also need to go to the air conditioning equipment cabins on both sides of the EMU to monitor the sound of the wind turbine operation and confirm that the air conditioning cooling equipment is in good condition, and the hot air blown by the cooling fan at this time makes them feel both dry and hot. At 17:20, after a day of operation, the EMU passed the acceptance of the quality inspector and was ready to go.

In the heat, he climbed to the roof of the train

Check the ventilation and cooling effect of air conditioning in the carriage

The EMU "lung clearing division" is a "heat-resistant" profession. At work, they braved the sweltering heat, loaded the passengers in the carriage in their hearts, meticulously overhauled each group of air conditioners, and every drop of sweat they quietly evaporated turned into a refreshing cool breeze like a spring breeze.

Material: Sichuan Reporter Station of People's Railway Newspaper Co., Ltd. (Chengdu Bureau Group Company Rong Media Center)

Text: Hu Zhiqiang Sun Yue

Photo: Hu Zhiqiang Huang Qiang

Disclaimer: This article is reproduced for the purpose of transmitting more information. If there is a source labeling error or infringement of your legitimate rights and interests, please contact the author with the proof of ownership, we will correct and delete it in time, thank you.