laitimes

Liu Wenhua investigates winter heating preparations

author:Nine factions view the world

On October 21, Liu Wenhua, deputy secretary of the municipal party committee and acting mayor, investigated the city's winter heating preparations. He stressed that it is necessary to firmly establish the people-centered development thinking, further scientific and accurate scheduling, strengthen service guarantees, and do a good job in winter heating work with heart and affection to ensure that the people are warm through the winter.

In the heating command center of the municipal heating company, Liu Wenhua inspected the heating area, heat load, actual heat indicators and other relevant data in real time through the smart heating platform, and listened carefully to the report of the person in charge of the municipal heating company on the preparation work for heating. He pointed out that winter heating is a people's livelihood project and a people's heart project that benefits thousands of households. All relevant departments at all levels should strengthen service guarantees, take the initiative to understand the demands of the masses, coordinate and solve problems in a timely manner, pay close attention to the people's livelihood work of heating, and send warm care to the masses. Heat enterprises should scientifically predict the difficult problems that may be encountered, further improve the level of refined management, and carefully prepare heat sources, equipment maintenance, transformation and debugging, water injection and pressure, emergency support, etc., to ensure the normal operation of heating equipment during the heating period。 Subsequently, Liu Wenhua walked into the heating customer service information center to learn more about the heating problems and acceptance reported by the masses. He asked the staff to patiently and carefully answer the calls from the masses, conscientiously do a good job in communication services, and improve the satisfaction of the masses with high-quality and efficient services.

Pressure barrier stations are the key to the stable operation of heating systems. During the investigation, Liu Wenhua came to the Guangyang Road Pressure Barrier Station to learn more about the progress of the central heating pipe network project, inspect the operation of equipment such as plate heat exchangers and heat grid circulating water pumps on the spot, and listen to daily management, duty duty, emergency repair and other work reports. He asked relevant enterprises to strengthen equipment commissioning, improve emergency plans, strengthen operation monitoring, maintain the smooth flow of pipe networks, and ensure the safe and stable operation of the heating pipe network system.

Shanxi Sunshine Power Generation Co., Ltd. undertakes more than 65% of the city's heating tasks. Liu Wenhua inspected the operation of the unit, thermal coal reserves, heating preparations, etc. He asked relevant enterprises to consolidate the responsibility of supply assurance, strengthen monitoring and scheduling, strengthen safety management, organize production and operation in a scientific and orderly manner, and go all out to do a good job in heat source reserves to ensure that the heat source runs smoothly and should be supplied. Relevant counties, districts and departments should coordinate services in a timely manner, do a solid job in the supply of thermal coal, transportation services, etc., and provide a solid guarantee for the masses to warm up in winter.

【Source: Yangquan Party Building Network_Party and Government News】

Disclaimer: The copyright of this article belongs to the original author, if there is an error in the source or infringement of your legitimate rights and interests, you can contact us through the mailbox, we will deal with it in a timely manner. Email address: [email protected]

Read on