laitimes

The construction project of ceramic road in Pingchuan District entered the pavement paving

author:Hirakawa Fusions
The construction project of ceramic road in Pingchuan District entered the pavement paving

Recently, the reporter saw at the construction site of the ceramic road construction project that the workers were laying asphalt concrete, the oil layer slowly pushed forward, the roller rolled back and forth, and the new road surface continued to extend forward.

The construction project of ceramic road in Pingchuan District entered the pavement paving

Shi Fupeng, project manager of the ceramic road construction project, said: "The ceramic road construction project has been paved with surface asphalt since the 12th, the lower layer of asphalt has been completed on the 13th, and the overall paving task has been completed on the 14th with quality and quantity. ”

The construction project of ceramic road in Pingchuan District entered the pavement paving
The construction project of ceramic road in Pingchuan District entered the pavement paving
The construction project of ceramic road in Pingchuan District entered the pavement paving

It is understood that the ceramic road construction project is one of the key construction projects in the North Ring Road area of the Pingchuan District Urban Renewal Action, with a total length of 1.1 kilometers and a width of 30 meters, laying municipal infrastructure such as water supply and drainage, lighting and so on. After the completion of the project, it will further alleviate the traffic pressure in the urban area, improve the structure of the urban road network, and play a positive role in accelerating the upgrading of the urban file, increasing the capacity and improving the quality.

Pingchuan District Rong Media Center Reporter: Zhao Xue Xin Qianqian Editor: Zhao Ying