Renovation Diary Day 243 - Cleaning

author:nbyunong

March 18, day 243 of renovation.

Today the cleaning aunt appeared and cleaned the whole house.

Renovation Diary Day 243 - Cleaning

I'd like to talk about a few things that were done before cleaning.

1. Wash the wardrobe installation. Because it is a finished product installation, no holes are punched, and glass glue is fixed on several interfaces. At the junction of the countertop and the wall, it is intended that the beauty sewing master will play beauty glue to avoid turning black in the future. It's just that the countertop is not accurately measured in advance, more than 2 mm, the master can only cut, fortunately the cutting site is outside the room, otherwise there is dust everywhere.

When the washing closet faucet was installed, because the total water valve was closed, there was no test of water, and a small episode occurred. Originally, the switch of the faucet was turned back and forth, and I told the master that I was used to turning it left and right. Without noticing, the master installed the faucet in the direction of the left to the middle, which I remembered later. We are accustomed to using our right hand to open and close the faucet, which should be opened from the right side to the middle, so that it is reasonable. Contact the master again, and he said that this matter can be completed in ten seconds. But for me, it was too hard. In the end, he turned to Manager Guo for help and let the plumbers "turn things around". I think whoever does the work should be managed to the end, and should not bother others. Therefore, I remind you that after installation, you must personally inspect. Afterwards, the installers did not admit it.

Renovation Diary Day 243 - Cleaning

2. Drying rack installation. This is a gift from the decoration company, Manager Guo said, if I don't like it, I can fold it into cash 1500 yuan to return, we buy it ourselves. Take a look at the pictures and compare the drying racks on the web. Although their brand Taobao can not be found, but the function is similar, it is not so tossed. If I had time, or If Manager Guo had told me earlier, I think I would definitely choose a drying rack that I liked more, and the brand was also a resounding drying rack.

3. Lamp installation. Originally, I wanted to install the lamps after cleaning, because every time I went to a new house, the shoes were covered with dust, which showed that this dust had accumulated enough. So I am afraid that the lamps are installed well, the new lights become "dust lamps", and cleaning is too troublesome. Manager Guo told me that when the lamps are installed, they will be protected.

The installation of lamps and lanterns has not been really completed so far, the decorations of the main lamp in the living room are broken, and the store re-ships; this time it is found that there are two light bulbs that are not lit, and the re-shipment, fortunately, the store did not grind with you, it is time-consuming, let the master come to the door again and again, sorry.

4. Bathroom installation. The glass door of the shower room was the first to be installed, the washing cabinet was also placed, and the bathroom shelf was also installed according to my preference. The toilet is the last to be installed.

Several issues were identified:

1, the finished product washing cabinet put in, and the wall is still 1-2 cm, the need for the United States sewing master to glue.

2, the mirror glass of the second guard is hung up, when the hand presses the mirror lamp, the whole mirror will shake, and you need to reflect this problem with Manager Guo.

3, I remember at the beginning, I proposed to customize the washing cabinet, rather than choosing the finished washing cabinet. Manager Guo proposed that it would cost more money. I didn't insist on it at the time. First of all, the length of my wash table can be longer, originally 130 cm, because there is only a 120 cm wash stand, so it shrinks [halo]. If the budget is not very tight, it is still recommended that everyone make it.

5. Painter repair. This work must be done after the installation of each finished product and after cleaning. Don't look at this tinkering, the painter spent a full 3 days.

Renovation Diary Day 243 - Cleaning

While cleaning is in progress:

1. Peel off the ground protective paper, taking away "several tons" of dust.

2. The sticker of the window is torn off, and the sand window is cleaned again.

3, all cabinets, including cabinets should be wiped clean.

4, the room has the smell of air freshener, a inquiry, is the glue remover.