laitimes

Hui County, Henan | Chen Xing, vice governor of Henan Province, visited Yuhe Town to investigate the post-disaster reconstruction work

author:Huixian Rong Media

On October 20, Chen Xing, vice governor of Henan Province, and his party visited Yuhe Town to investigate the post-disaster reconstruction work, accompanied by Liang Haoguo, second-level inspector of the Department of Civil Affairs of Henan Province, Zhu Dongya, vice mayor of Xinxiang City, Liu Junwei, secretary of the Huixian Municipal Party Committee, Li Jiyou, mayor of Huixian County, Yue Bin, executive vice mayor, responsible persons of relevant departments of the city and county, and main leaders of Yuhe Town.

Hui County, Henan | Chen Xing, vice governor of Henan Province, visited Yuhe Town to investigate the post-disaster reconstruction work

Vice Governor Chen Xing and his entourage first listened to a report from Yuhe Town on the situation of the whole town's farmland and the post-disaster reconstruction work in the mujiaying field, and then went deep into the village to inspect the progress of the housing repair and reconstruction project, and walked into the homes of the disaster-stricken masses, talked cordially with them, further understood their disasters and the recovery of production and life, and encouraged them to build a beautiful home and create a better life with the help of the party and the government.

Hui County, Henan | Chen Xing, vice governor of Henan Province, visited Yuhe Town to investigate the post-disaster reconstruction work

Vice Governor Chen Xing demanded: First, we must seize the opportunity to rush to drain the accumulated water from farmland. Adhere to scientific and systematic planning, seize the favorable opportunity to do a good job in farmland drainage, and further enhance the ability to prevent and reduce disasters; second, we must speed up the progress of farm house construction in accordance with procedures. In accordance with the relevant procedures of the housing construction department, do not wait for it, clarify the time node, and accelerate the repair and reconstruction of houses after the disaster under the premise of ensuring the quality of the project and ensuring the safety of construction; the third is to help the masses speed up the restoration of normal life. It is necessary to earnestly listen to the voices of the people, understand the needs of the masses, and on the basis of comprehensive disinfection, further strengthen the technical guidance for moisture removal and mold prevention in flooded houses, so that the lives of the disaster-stricken people can be restored to the pre-disaster level as soon as possible.

Hui County, Henan | Chen Xing, vice governor of Henan Province, visited Yuhe Town to investigate the post-disaster reconstruction work

After the disaster occurred, our town actively organized the cadres and masses of the town and village to carry out production recovery with all their might. Up to now, a total of more than 200 various types of machinery have been dispatched, 60,000 meters of ditches have been dredged, 15,000 meters of pipelines have been laid, nearly 20,000 mu of water in the field have been eliminated, 15,000 mu of land preparation has been prepared, and more than 7,000 mu of wheat has been sown.

Read on