laitimes

The Nanchang Railway Bureau is equipped with more than 120 sets of CRH380A EMUs, and there are 50 groups of long-term allocations at Nanchang West Railway Station. At night, the Nanchang West Train Station is a rat 🐭 nest. presently

author:ZSJ Army

The Nanchang Railway Bureau is equipped with more than 120 sets of CRH380A EMUs, and there are 50 groups of long-term allocations at Nanchang West Railway Station. At night, the Nanchang West Train Station is a rat 🐭 nest. At present, there are a total of 299 storage lines in Nanchang West, Xiamen North, Fuzhou South and other EMUs managed by the Nanchang Bureau, and the high-speed EMUs assigned by the Nanchang Bureau are close to 300 groups. After the completion of the Nanchang East EMU, it is not surprising that the Nanchang Bureau will be equipped with the Fuxing CR400 EMU produced by CRRC Qingdao. Nanchang East EMU is built, Xiamen North EMU is expanded, Ganzhou West EMU is to be built, and the Nanchang Bureau storage line and maintenance depot line have been added a lot. The new Fuxia high-speed railway, Changjinghuang high-speed railway, also need to be equipped with a new train, Changgan high-speed rail EMU purchase cost and Changjinghuang high-speed rail EMU purchase cost of about 4.5 billion, buy 2-30 groups of Fuxing EMU enough.

The Nanchang Railway Bureau is equipped with more than 120 sets of CRH380A EMUs, and there are 50 groups of long-term allocations at Nanchang West Railway Station. At night, the Nanchang West Train Station is a rat 🐭 nest. presently
The Nanchang Railway Bureau is equipped with more than 120 sets of CRH380A EMUs, and there are 50 groups of long-term allocations at Nanchang West Railway Station. At night, the Nanchang West Train Station is a rat 🐭 nest. presently
The Nanchang Railway Bureau is equipped with more than 120 sets of CRH380A EMUs, and there are 50 groups of long-term allocations at Nanchang West Railway Station. At night, the Nanchang West Train Station is a rat 🐭 nest. presently

Read on