laitimes

The Winter Olympics will explore the closed-loop | to welcome the New Year The National Bobsleigh Center has a taste of the New Year

The new year arrives, welcome the new year.

The Winter Olympics will explore the closed-loop | to welcome the New Year The National Bobsleigh Center has a taste of the New Year
The Winter Olympics will explore the closed-loop | to welcome the New Year The National Bobsleigh Center has a taste of the New Year

National Bobsleigh Center Volunteer Field Courtesy photo

As the Beijing Winter Olympics approach, the preparations for the National Bobsleigh Center in Yanqing have entered the final stages. The first batch of 38 university student volunteers have settled in the center, and they will provide guarantee services for athletes, coaches, etc. from all over the world in their volunteer positions, and officially start the "Winter Olympic Journey".

The Winter Olympics will explore the closed-loop | to welcome the New Year The National Bobsleigh Center has a taste of the New Year
The Winter Olympics will explore the closed-loop | to welcome the New Year The National Bobsleigh Center has a taste of the New Year

Photo by Yan Shengmiao

Today (January 25), 10 days before the opening ceremony of the Beijing Winter Olympics, coinciding with the lunar "Small Year", in the operation area of the National Bobsleigh Center, the staff not only posted blessing characters in various areas, but also provided steaming dumplings for people who came to eat. Volunteers from the Beijing Institute of Fashion ate dumplings and shouted "There is a taste of the New Year".

The Winter Olympics will explore the closed-loop | to welcome the New Year The National Bobsleigh Center has a taste of the New Year

The National Bobsleigh Center is a venue for bobsleigh, steel-framed bobsleigh and bobsleigh competitions at the Beijing Winter Olympics. It is home to China's first bobsleigh track, the world's 17th and Asia's third bobsleigh track, with the world's only 360-degree slalom and a design speed of more than 130 kilometers per hour, which is called "Ice F1". The track is designed into a complex space three-dimensional surface, and the "millimeter-level" hyperboloid concrete injection and finishing molding technology is used to realize the one-time spray pouring molding of the 1.9 km track, which is one of the new competition venues with the highest design difficulty, the greatest construction difficulty and the most complex construction process in the Winter Olympic Games.

Source: Winter Olympics | Author Guo Dan Yan Shengmiao Ma Nan

Edited by Ma Nan

Process Editor Wu Yue

Read on