laitimes

The New Kunchu Expressway in Yunnan was opened to traffic

author:Xinhuanet client

Video loading...

Kunming, 21 Jan (Xinhua) -- According to the China Railway Construction Kunlun Investment Group, the new Kunchu Expressway (Kunming to Chuxiong), which was invested and constructed by the company, was completed and opened to traffic on 21 January. This will significantly alleviate the traffic pressure on the Kunchu Expressway, an east-west corridor in Yunnan.

The New Kunchu Expressway in Yunnan was opened to traffic

The New Kunchu Expressway (left) and Wuyi Expressway (drone photo) taken on January 21. Photo by Xinhua News Agency reporter Chen Xinbo

The New Kunchu Expressway in Yunnan was opened to traffic

View of the New Kunchu Expressway taken on January 21 (drone photo). Photo by Xinhua News Agency reporter Chen Xinbo

Kunchu Expressway is the capital of Yunnan Province, Kunming to eight prefectures and cities in western Yunnan (including Dali, Lijiang, Dehong, etc.) traffic artery, due to the large traffic flow, often in recent years often serious congestion. To this end, Yunnan decided to build a double line from Kunming to Chuxiong and Chuxiong to Dali.

Among them, the new Kunchu Expressway starts near Minshan in Wuhua District, Kunming City, and ends in Guangtong Town, Lufeng City, Chuxiong Prefecture, with a total length of about 106 kilometers, a bridge-tunnel ratio of 62.8%, and is built according to the standard of a two-way six-lane expressway with a design speed of 100 kilometers per hour.

The New Kunchu Expressway in Yunnan was opened to traffic

Mantis Chuante Bridge on the New Kunchu Expressway taken on January 21 (drone photo). Photo by Xinhua News Agency reporter Chen Xinbo

After the completion and opening of the new Kunchu Expressway, it will only take more than an hour to travel from Kunming to Chuxiong, and will become a new trunk line driving the economic development of western Yunnan.

Read on