laitimes

Integrated management of estuarine oil production plant in Shengli Oilfield helps "less wells and high yield"

author:Sinopec Shengli Oilfield

On January 11, researchers conducted a quality tracking inspection of the mud density in the construction of the Chen 373-Ping 211 drilling.

The estuary plant integrates the technical management forces of reservoirs, geology, drilling, completion and commissioning, establishes a geological engineering integration team, and explores the implementation of the "drilling and completion integration" management model. They do a good job of comprehensively designing the source of each well to ensure high-quality drilling and completion. Up to now, 12 wells have been implemented, with a total daily oil output of 73.7 tons and a cumulative oil production of 3574.4 tons, helping to achieve the goal of "less wells and high yield".

(Author: Wu Mushui Cui Shuangyan Editor:Yu Qinghua Review:Wang Ying Producer:Li Yan)

Read on