On December 6, 2021, Jiangyin Csschui Chengxi Ship Repair Base, four 62,000 dwt cranes ordered by Zhongbo Steamship Company began to be delivered one after another, and the first ship was named "Taixing" ship, and the first ship was handed over after the first navigation whistle was sounded. The "Taixing" ship is twice as large as the original ship type in Zhongbo and is currently the world's largest multi-purpose heavy crane with the largest load tonnage.
The deck of the "Taixing" steamship is equivalent to the size of 14 standard basketball courts, and the deck surface is flat, which is convenient for loading large wind power blades and other mechanical equipment; the yellow container foot is also reserved on the deck to facilitate the placement of containers.
The "Taixing" ship is the first 60,000-ton heavy crane in the fleet of the Sino-Polish Steamship Company, and three "sister" ships of the same size will be launched next year.
Column Editor-in-Chief: Zhang Chunhai Text Editor: Zhang Mo Photo Editor: Zhang Mo
Source: Author: Li Maojun