laitimes

Video | the urban direct high-speed rail station shortened by more than 10 minutes Longchang Wanlong Road is expected to be opened to traffic in 2024

Source: Sichuan Daily - Chuanguan News

Chuanguan News Reporter Zheng Zhihao Neijiang Observation Luo Yin Tang Guang Photo report

On October 14, at the construction site of the north extension of Wanlong Road in Guhu Street, Longchang City, Neijiang, excavators and bulldozers were working at the same time, and workers were carrying out construction work.

Standing at the construction site, looking at the two-way six-lane with a wide field of view and forward extension, Li Tao, the person in charge of project management, pointed to the project location map to introduce the significance of the north extension of Wanlong Road.

The design of the Wanlong Road North Extension Line starts from the intersection of Xiangyang Road and Wanlong Road in Longchang City, and ends at the intersection of Longjie Expressway and North Ring Road, with a total length of about 1.4 kilometers, spanning the Chengdu-Chongqing Railway. After completion, it will be the most convenient road for Longchang Urban Area and high-speed rail groups. It is estimated that it currently takes about 25 minutes to drive from the main city of Longchang to Longchang North Railway Station, while the future of the Wanlong Road North Extension Line will be shortened by more than 10 minutes.

Video | the urban direct high-speed rail station shortened by more than 10 minutes Longchang Wanlong Road is expected to be opened to traffic in 2024

"At present, the masses in Longchang City need to pass through Renmin Middle Road, cross the Renmin Bridge, pass through North Ring Road and then enter the Longjie Expressway, with a detour distance of up to 5.8 kilometers, and the Wanlong Road North Extension Line bends and straightens, saving 4.4 kilometers, which will greatly facilitate the connection between Longchang Urban District and the high-speed rail group." Li Tao introduced that the construction site at most there are more than 200 workers on site construction, road construction content includes lighting, electricity, communications, greening, etc., the whole line set up a perfect comprehensive pipe network and traffic safety facilities, mainly traffic functions, both service functions and landscape effects, is expected to be completed this year.

Video | the urban direct high-speed rail station shortened by more than 10 minutes Longchang Wanlong Road is expected to be opened to traffic in 2024

It should be noted that the Northern Extension of Bandung Road is a sub-project of the construction of Bandung Road. Stretching the field of vision, the starting point of Wanlong Road intersects with Longchang South Ring Road, and the end point extends north to the planned area to be built, with a total length (including bridges) of about 4850 meters, and a standard road width of 44 to 55 meters. The remaining two sub-projects are the Southern Extension of Bandung Road and the Northern Section of Bandung Road. Among them, the northern section of Bandung Road has passed the acceptance and delivered for use on September 28 this year.

"The southern extension is 2.3 kilometres long and includes an 880-metre-long viaduct with a net height of 60 metres and a net span of 90 metres. Strive to start construction at the end of the year, and the construction period is 3 years. Li Tao said that Wanlong Road is an important road connecting the chengdu-Chongqing high-speed rail station in the north and the hongguang industrial park in the south, and undertakes the important task of connecting the planned area to be built with the longchang urban area, which can be said to be the vanguard of longchang to expand the space of the city, and the whole line is expected to be completed by the end of 2024.

Focusing on the construction of the "Pioneer Zone for High-quality Life and Livable Places in Chengdu and Chongqing Areas", Longchang City proposed at the Second Party Congress to vigorously implement the strategy of urban quality improvement, with "westward, north, east and south", and fully expand the space of the city.

Beilian is a high-standard construction of a number of education projects represented by the Longchang School of Beijing Language and Culture University, improving relevant supporting facilities, building a county sub-center, and creating a new city of education in the north that integrates education, vocational training and residence.

Nanyou is relying on the construction of "park in the park" such as the food industrial park, optimizing the new space for industrial development in the south, improving the supporting facilities such as residence, and building a new area in the south of the city that integrates industry and city and balances work and housing.

Wanlong Road, as an important vertical in the "six horizontal, six vertical and one ring" of Longchang City's planning road network, will become a traffic avenue running through the north and south of Longchang City after completion, becoming a brand-new city business card, which will promote the acceleration of the development and construction of the planned area, drive the development and construction along the road, solve the problem of travel difficulties for the masses, and improve the infrastructure of the area.

This article is from [Sichuan Daily - Chuanguan News], which only represents the author's views. The National Party Media Information Public Platform provides information dissemination services.

ID:jrtt