Acceptance (home inspection) is a serious track model for office decoration in Xi'an, and the acceptance of various parts of the decoration can be presented according to some quality problems in the early stage of decoration. In addition, Xi'an office decoration inspection is also very needed, not only to guarantee the quality of decoration, but also a company's general serious warranty to the outside world.

The decoration acceptance is divided into three stages: initial, medium and final stage, and the acceptance items at each stage are not similar, especially the acceptance of hidden projects in the middle stage, which is crucial to the quality of the group's decoration. Here, Xi'an office decoration acceptance of three Chinese New Year's Eve stages.

Xi'an office decoration acceptance of the initial acceptance

The most serious part of the initial acceptance is whether the raw materials (such as putty, glue, etc.) can be cut off with the raw materials on the estimate sheet in the convention, especially whether the brand of the raw materials (wires, water pipes) of the water and electricity can belong to the public brand of the decoration company, and the remaining raw materials are mixed in the quality guess according to the appearance of the product to affect the early construction. If the owner invents the difference between the raw material and the brand in the convention, he can refuse to name it on the raw material acceptance form until it is negotiated with the decoration company. If the owner is not familiar with the evidence, it is proposed to ask a third-party decoration supervision company to delay the participation, guarantee the quality of the decoration, get rid of the decoration trap, and cut the unwanted entanglement.

Xi'an office decoration acceptance interim acceptance the same general decoration held for 15 days to hold a mid-term acceptance, the mid-term acceptance is divided into the second acceptance and the second acceptance. The first acceptance touched on the suspended ceiling, water circuit, wood products and other projects, and the second acceptance was to hold inspections specifically for the waterproof rooms under decoration. It is the most magnificent track model of the decoration acceptance in the medium term, and whether the acceptance can be qualified will affect the policy of multiple decoration projects in the early stage.

1, the ceiling: the acceptance of the ceiling from the important search of the ceiling of the wooden keel can be painted with fireproof raw materials, followed by the search of the spacing of the boom, the spacing of the boom is not overlapped Chinese New Year's Eve otherwise it will affect its force, the spacing should be between 600mm-900mm. Then mainly check the robustness of the boom and whether there are signs of waving. The boom should be operated to shorten the bolt robustly, and some foremen operate the wooden bolt in order to save money, and it is difficult to guarantee the immutability of the boom. Vertical target index neck rod must be operated shortened bolt robust, transverse can operate plastic bolt. The end should also be used to search for the flatness of the keel with the key points of the pull cord.

2, the waterway is more beginning: the inspection of the waterway is more important is to hold the suppression implementation, the pressure is not less than 6 kg when the pressure is not less than 6 kg, the pressure is not less than 15 minutes, and then search whether the pressure gauge can have a pressure relief environment, if the pressure relief is presented, it is necessary to search whether the valve can be blocked, if the pipeline leakage problem is presented, the caretaker should be immediately looked after, and the pipeline leakage environment will be placed after the reward and punishment before the next step of construction is transferred.

3, the circuit is more beginning: when the acceptance of the circuit, it is necessary to exhaustively operate the wire for the brand of the decoration company and whether the wire can meet the standard. The wire that does not meet the standard has a coarse copper core in the outer skin Chinese New Year's Eve an environment with a thin copper core, and these two kinds of substandard wires have an impact on the current load, causing the owner to have a slight hidden danger in future operations.

At the beginning of the search circuit, it is also necessary to search the blocked environment of the socket, if the original socket has been displaced, the displacement place should be held to prevent moisture and waterproof measures to reward and punish, and the use of more than 3 layers of waterproof tape to hold the blockade. At the same time, it is also necessary to search whether the circuit in the ceiling can also be negotiated with waterproof tape to hold a reward and punishment.

4, wood finished products: to deal with the on-site manufacturing of wood products from the important details of whether its shape can be calculated to meet the requirements, the size can be correct. The wooden door manufactured on site should also check whether the indicators of the opening target of the door can be fair, and the door gap above the wooden door and the swing is not more than 3mm, and the lower seam is generally 5-8mm. In addition to inspecting the door cracks, you should also search whether the seams of the door cover can be careful. Wall tiles, floor tiles: Walls, floor tiles are important is to search for their empty drum rate and color difference. Owners can operate small hammers to knock on the corners of walls and floor tiles to search for signs of empty drums. The empty drum rate of walls and floor tiles does not exceed more than 5%, otherwise it will appear zero. It is worth detailing that the walls and floor tiles are not allowed to present local empty drums, the mortar is not plump, the grass-roots measures are not appropriate, the tile soaking water is not enough Chinese New Year's Eve about to cause the tile place to be empty, if the tiles present a local empty drum, the owner should ask the foreman to remove this part of the tile and re-paste.

When searching for color differences, it is necessary to detail whether the brands of the tiles are similar, whether they can be the same batch number, and whether they can be paved with the same pro kung fu. Owners can also search the walls, floor tiles and tiles of the du ya degree, the same general environment, seamless bricks of the brick seams in the 1.5mm at the mercy, not more than 2mm, the edge of the curved tile tiles are 3mm at the mercy. The rest should also search for walls and floor tiles to find an environment in which they can be deflected.

Wall, top: acceptance of the wall, the top surface should search the flatness of its putty, you can use the ruler to hold inspection, deviation within 2-3mm is qualified. When the owner inspects the wall and the top surface, he should especially detail whether the yin and yang angles can be simple and straight, and check it with a square ruler.

If the owner issues a Chinese New Year's Eve white problem during the mid-term acceptance, he should immediately tell the foreman to request rectification, and the foreman should take care of the owner to hold another acceptance after the rectification is over.

5, waterproof: waterproof acceptance is another important part of the mid-term acceptance. The same general floor drain room urban waterproof, whether the waterproof can be in place not only affects the owner's same general subsistence, but also affects the strength of the downstairs owner. Water avoidance implementation is a rare inspection of waterproof essentials in home improvement, when holding water avoidance implementation, the foreman must confirm the water avoidance kung fu with the owner and the downstairs residents at the same time, and then block the drainage hole of the room to put the water into the room (the water surface height is not less than 3cm), and after 24 hours, ask the downstairs owner whether there are signs of leakage.

In addition to searching the waterproofing of the floor drain room, the owner should also accept the waterproofing of the wall of the shower room, and when searching the wall waterproof, you can first search whether the brush paint on the wall can be symmetrically cut off, whether there are signs of brush leakage, especially to search whether the yin and yang angle can have a leaky brush, and the leakage brush according to the yin and yang angle will cause moisture return mold.

The waterproof height of the wall should also be accepted, and the owner can check whether the waterproof height of the wall can reach the height permitted by the company, the same waterproof height of the flood shower room is 1.8m at the mercy of the arrangement, but from an economic point of view, the owner can set a waterproofing of 1.8m high in the shower area, and other areas set up a waterproofing of more than 1.5m.

Xi'an office decoration acceptance of the final period of acceptance

Compared with the mid-term acceptance, the comparison between the final period acceptance and the mid-term acceptance is rough, and the important thing is to hold an inspection of the beginning of the medium-term project policy. For example, wood products, walls, and top surfaces, the owner can hold inspections on the appearance of the paint, the smoothness of the paint, whether there are signs of falling and whether the colors can be cut off.

The circuit is important to check whether the wiring of the socket can be accurate and whether it can be energized, and the socket of the bathroom should be equipped with a waterproof cover.

The search anomaly at the beginning of the waterway is still the focus. The owner must search whether there is a sign of "inverted slope" in the room with floor drain, and the inspection point is very rough: open the tap Chinese New Year's Eve about the shower, and must work hard to see whether the flowing water in the air can be delayed, and whether there are some signs of water accumulation. In addition, inspections should be held for the delay of floor drains and the water supply of toilets and basins. In addition to holding acceptance at the end of the medium-term project policy, the owner should also accept the decoration projects held in the final stage such as flooring and plastic steel windows. When accepting the floor, you should check whether the color of the floor can be cut off, whether there can be warping, ringing and other environments. When accepting the plastic steel window, you can search whether the edge of the plastic steel window can leave 1-2cm short place to add styrofoam. The rest should also search for the robustness of the plastic steel window, the same general environment, every 60-90cm should be a bolt strong plastic steel window, if the plastic steel window of the robust bolt is too small will affect the operation of the plastic steel window.

At the time of the final acceptance, the mourner should also elaborate on some detailed topics, such as whether the pipes in the kitchen and bathroom can be left with a backup port for search, and whether the status of the water meter and gas meter can be easily read.