laitimes

Some of the processes you need to understand before renovation

author:Xie Shuai engineering German villa decoration

First use a flow chart to introduce the entire decoration content, as shown in the figure:

Some of the processes you need to understand before renovation

Decoration style and budget

Pre-design and conception. First of all, it is necessary to conceive the structure of the house and the basic dimensions designed during the decoration, so as to facilitate the procurement and accounting of various building materials in the later stage. The existing structure is then split and reorganized according to the concept and dimensions, and the final design sketch can be drawn by itself or by the renovation company.

Determine your favorite decoration style and budget for the renovation. If you want to make your home more modern and stylish, you can choose modern style or simple style.

Some of the processes you need to understand before renovation

Modern style and minimalist style is the most popular decoration style at present, the use of geometric line decoration, abandon the traditional ceiling, the use of today's most popular double eyelid ceiling, do not need excessive decoration, to function as the starting point, pay attention to the comfort of life, the space structure is clear and beautiful, emphasizing the simplicity and generosity of the appearance.

If you don't have a small budget, you can consider choosing a japanese style like Japanese style and Nordic style. These two styles are relatively economical.

Some of the processes you need to understand before renovation

The Japanese decoration is simple and natural, the design details are more meticulous and exquisite, and the use of space is more adequate and practical.

2. Determine whether the project is half inclusive or all inclusive

Some people will be very entangled in the point, in the end half a package is cost-effective or all-inclusive cost-effective? In fact, the medium term is mainly during the construction period, after the start of construction, plumbers, wood and electricians recently entered the construction site. The time for the transformation of the water circuit is about 5-a week, and then it takes about two weeks for carpentry to do suspended ceilings, background walls, etc. Half a package then the decoration company is responsible for the construction and providing some auxiliary materials, the main materials and some important auxiliary materials provided by the owner! The all-inclusive auxiliary materials are also provided by the renovation company. Both half-pack and all-inclusive will have their own advantages and disadvantages.

3. The construction process of each link

Demolition works→ hydropower projects→ tile works→ carpentry works→ oil works.

Demolition works

The demolition of the wall must pay attention to safety issues, using the principle of first going up and then down, first inside and then outside, first pipeline, equipment structure components.

Hydropower engineering

To do a good job in a hydropower project, the first thing to do is waterproof. Regarding waterproofing, most of the plumbers used in waterproof construction should be coated with film waterproofing, and the advantages of this waterproof method are simple and convenient, low cost, and convenient maintenance. Therefore, before implementing a hydropower project, the first thing to do is waterproof measures.

Tile works

Bricklayers also include filling in the door cover window frames, so the door and window workers also have to enter the site at the same time. Iron works are also made at this time, such as stair handrails, carved decorations, etc.

Woodworking engineering

Decoration often needs to make wooden decoration and storage cabinets on the wall and on the ground, in order to ensure that the wood products of the house are at the same level, it is necessary to carefully measure and play the ink line before the start of construction, so as to determine the horizontal benchmark line of all carpentry production.

Material selection: Whether it is a wardrobe or a shoe cabinet, the surface door needs to be made of the same plate to ensure the uniformity of pattern and color. After the finish of the woodwork, a layer of white glue is also applied on the outside to avoid arching or cracking on the surface.

Oil engineering

When painting, we should pay attention to the temperature of the environment, the humidity in the air will affect our construction, if the temperature is too low or the humidity in the air is too large, the water vapor adheres to the wall, then the adsorption force of the paint will become worse, and when the moisture volatilizes, the paint will fall off, so try to avoid forced construction in the case of high humidity and high cold.