laitimes

Xinxiang: Quickly formulated the implementation plan for the post-disaster recovery and reconstruction of water conservancy projects, and has implemented 259 million yuan of funds

author:Henan Business Daily
Xinxiang: Quickly formulated the implementation plan for the post-disaster recovery and reconstruction of water conservancy projects, and has implemented 259 million yuan of funds

Henan Business News (Chief Reporter Sun Ke/Wen Reporter Song Yameng/Photo) On August 26, the Information Office of the Provincial Government held a series of special press conferences in Xinxiang on "Henan Province To Accelerate Post-disaster Reconstruction", and Guo Shudong, deputy director of the Xinxiang Municipal Water Conservancy Bureau, introduced that affected by the heavy rainfall, the Weihe River and the Communist Canal in Xinxiang City have been running for a long time, and all 30 small and medium-sized reservoirs in the city have been filled with overflow. The water conservancy projects were seriously damaged, and a total of 4,808 water conservancy facilities such as reservoirs, rivers, embankments, revetments, sluices, rural drinking water projects, and irrigation projects were damaged in the city, with a direct economic loss of 1.51 billion yuan.

After the rainstorm, Xinxiang City, in accordance with the arrangements of the provincial party committee and the provincial government on post-disaster recovery and reconstruction work, quickly formulated the "Implementation Plan for the Post-disaster Recovery and Reconstruction of Water Conservancy Projects in Xinxiang City". At present, 259 million yuan of funds have been implemented for post-disaster reconstruction of water conservancy. Completed the construction of the Lishitun section of the right embankment of the communist canal, the overflow and reinforcement of the cofferdam overflow, the reinforcement of the right embankment of the Weihui Jicheng section, the blockage of the drainage trough gap in the Weihui urban section of the Dongmengjiangnu River, the Houxinzhuang section of the Weihe Muye District, and the plugging and restoration of the Songzhuang diversion weir in the Liuwei Slope Flood Detention Area, and the restoration of the rural safe drinking water project; in view of the water conservancy projects under construction such as the Fengquan Lake Diversion and Storage Project and the Gongqu Temperance Gate, which were seriously damaged by the disaster, the construction units were actively organized to drain the accumulated water and create conditions to restore the construction of the project; The work plan for the use of compensation in the flood storage and detention area of Xinxiang City is used to guide the implementation of compensation for the disaster-stricken people in the flood storage and detention area.

Editor: Liu Mengge Ji Qianqian

Read on