laitimes

Promote the deep integration of industrial upgrading and rich people and strong areas Yongnian: Twist effective investment to optimize the supply structure

author:Handan News Network

Recently, Yongyang Special Steel Group with a total investment of 3.2 billion yuan in Yongnian District started construction of 9 key projects such as the Linhuanguan Railway Special Transport Line. The 9 projects involve ecological environment improvement, power equipment manufacturing, fastener enterprises retreat and relocation and other fields, which will be of great significance to the high-quality economic development of Yongnian District.

Since the beginning of this year, Yongnian District has taken the opportunity to further promote the "triple four innovation and five optimization" activities, highlighting industrial drive, urban and rural upgrading, integrated development, grasping projects and promoting development, comprehensively promoting the construction of overall, basic and strategic key projects, giving full play to the key role of effective investment in optimizing the supply structure, driving transformation and upgrading with high-end high-quality projects, and accelerating the high-quality economic development of the whole region.

"Three focuses" to improve the quality of the project. The district focuses on industry-driven, focusing on the cultivation, development and growth of traditional industrial extension chain, supplementary chain, strong chain and emerging industries, fully implementing 38 industrial production projects such as Yongyang Special Steel Phase II, Jinli Battery Separator Material Industrialization, and Stanoz intelligent equipment manufacturing, accelerating the upgrading of traditional industries of special steel and fasteners, accelerating the cultivation of emerging industries such as high-end equipment and new materials, and comprehensively promoting and upgrading high-quality development; focusing on urban and rural upgrading, based on the docking of the main urban area of the city, focusing on promoting the overall relocation of Yongnian Yizhong. Promote 37 infrastructure and people's livelihood projects such as CLP domestic waste incineration power generation to comprehensively improve the development carrying capacity and the level of urban and rural construction; focus on integrated development, and vigorously promote 10 commercial and trade service projects such as Siltronic fastener dry port base and raw material distribution center, fastener technology service center, fastener innovation and entrepreneurship center, and realize the in-depth integration and development of industry, culture, tourism, commerce and trade.

"Multi-point force" to improve the quality of investment promotion. The district adopted various forms of investment promotion, successfully organized and held the first Yongshang Conference, standard parts manufacturers friendship and product exhibition, fasteners and equipment exhibition, participated in the city's key industry promotion meeting and cooperation project signing ceremony, "5·18" Langfang International Economic and Trade Fair, central enterprises Hebei and other activities. Accurately select businessmen, set up a "5 + 1" precision investment promotion class, focus on docking equipment manufacturing, new energy and new materials, high-tech, high-end fasteners and other advantageous industrial projects, demarcate regions and sub-industries, go to many places to carry out promotion activities, invite well-known merchants to visit nearly 20 batches in Yongnian, and implement the pre-trial joint review mechanism of the project under discussion, comprehensively evaluate investors, scientifically determine in-depth tracking docking projects, and ensure that high-quality projects are signed and landed as soon as possible. Since the beginning of this year, Yongnian District has signed 20 investment projects such as Shenke Machinery and Maiheng High-strength Fasteners, with a total investment of 8.08 billion yuan, of which 6 projects have been completed and put into production, 8 projects are under construction, and 6 projects are being actively promoted.

The "three strengthening" provide guarantees for the construction of the project. The district strengthens the support of policy elements, focuses on the project landing, construction start-up, production and efficiency, etc., carries out docking assistants with "nanny-style" and "shop small two-style", implements supporting services and infrastructure guarantees, adheres to the priority guarantee of land elements, strictly implements the positive list system of ecological environment, and includes projects such as Stanozol intelligent equipment manufacturing, Jinli battery separator material industrialization, and Yongyang Special Steel Phase II into the positive list; strengthen the first-line package help, and fully implement the "establishment of special class package union, first-line full package union, dynamic tracking package union, Monthly summary reminders and quarterly dispatch supervision" have effectively promoted the construction of key projects; strengthened the revitalization measures for inefficient land use, and accelerated the progress of "cage for birds". Since the beginning of this year, the district has revitalized more than 800 acres of land, and a number of projects have landed and started construction or are about to start construction.

The construction of high-end and high-quality projects has led to effective investment and stimulated economic vitality. This year, the district implemented a total investment of 40.6 billion yuan, the annual planned investment of 12.8 billion yuan of 111 key projects, of which 60 projects of more than 100 million yuan were newly started, and 10 provincial key projects and 30 municipal key projects were striven. There are 40 new fixed investment projects of more than 50 million yuan, with a total investment of 13.05 billion yuan, and 5.24 billion yuan of investment has been completed. Yongyang Special Steel Phase II heavy rail adopts the first set of independent design and manufacturing universal rolling mill in China, which means that the situation of long-term dependence on imports of key processes and equipment technologies of China's heavy rail production line will be reversed. The self-sufficiency rate of parts of Guozhi cold pier machine project has reached 60%, filling the gap in the production of high-end cold pier machine in Hebei Province, and the independently developed Internet of Things intelligent system has made it the first cold pier machine manufacturing enterprise in China to realize remote control detection and mobile phone app control management. The construction of Jinli Battery Separator Line 8-11 will further enhance the leading role of the industry and lay the foundation for building an important domestic battery separator material base.

Key projects have been strongly promoted, accumulating development potential and strengthening industrial clusters. Yongnian District through the revitalization of inefficient idle land, the introduction of Stano equipment manufacturing project is expected to become the largest aluminum formwork equipment manufacturing enterprises in the north, the construction of shenzhen machinery and equipment, Qiao Peng high-end fastener industrial park project will accelerate the promotion of the main urban area of the fastener enterprises to withdraw from the city relocation, the upgrading process. The northern medical equipment disinfection center project invested by the domestic industry leader Lao Ken Company has entered the Shengxiang Medical Protection and Health Science and Technology Industrial Park, which will effectively promote it to become a new industrial gathering point and shining point in the city. Jinshengda high-end fastener production and quality improvement project is committed to the basic technology of fasteners, material breakthroughs, and Shenyang University for industry-university-research cooperation, the first in the country to adopt quenching and tempering management and comprehensive control intelligent system, to create the country's largest high-strength fastener quenching and tempering center, to promote the proportion of yongnian fastener high-end products from 30% to 40%. The start of the project of Guodingxin Fastener Testing Service Center will surely help the fastener industry to upgrade and accelerate the pace towards the middle and high-end. The launch of the Siltronic fastener dry port and raw material distribution center project will surely effectively integrate the intelligentization of raw material procurement, international and domestic trade, and logistics, and realize the deep integration of industrial upgrading and rich people and strong areas.

(Changling Mountain)

Read on