On October 31, He Dong, deputy secretary of the state party committee and acting governor, went to Linxia County and Linxia City to investigate and supervise the prevention and control of the epidemic and the construction of key projects.

At the quarantine point of the Shuangcheng Toll Station in Linxia County, the isolation point of the Grand Hyatt Hotel, the county people's hospital, and the county CDC, He Dong visited the front-line staff and learned more about traffic quarantine, isolation and control, hospital infection protection, nucleic acid testing, vaccination, etc. He stressed that the current epidemic situation is very severe, and it is necessary to always tighten the strings, work hard, be thin and fine, solid and realistic, and standardize and accurately grasp the implementation of various measures. It is necessary to conscientiously implement the requirements of Vice Premier Sun Chunlan's speech during his investigation and investigation in Gansu, further consolidate responsibilities, pay close attention to details, strictly enforce discipline, and weave a tightly woven prevention and control network in accordance with the work arrangements of the daily dispatch meetings of provinces and prefectures. It is necessary to strengthen the standardized management and closed-loop management of medical institutions at all levels and centralized isolation points, consolidate the responsibility of the first responsible person for the prevention and control of the president's hospital infection, strictly implement the "three districts and two channels" regulations, standardize the operation process, strengthen the duty duty, and resolutely put an end to the occurrence of hospital infection. It is necessary to strengthen the self-protection of front-line workers, equip them with sufficient protective equipment, implement measures such as health monitoring and environmental disinfection, reasonably arrange duty rotations, care for their daily needs, and provide a strong guarantee for their safe work. It is necessary to strengthen the management of nucleic acid laboratories, scientifically and rationally allocate personnel and equipment, strengthen the connection between all links of procurement and inspection, give full play to the existing nucleic acid detection capabilities, and strive to improve the quality of sampling and testing, so that the test results are accurate and reliable, and the report feedback is timely and effective. It is necessary to comprehensively take a variety of measures to accelerate the progress of vaccination, standardize and orderly promote the vaccination of people aged 3-11, so that they can be fully connected and quickly connected, and build a solid immune barrier.
At the site of the Li'an Xinju shantytown transformation project, He Dong learned in detail about the implementation of epidemic prevention and control measures and the progress of project construction. He stressed that it is necessary to make overall plans for epidemic prevention and control and economic and social development, and while not relaxing the prevention and control of the epidemic, do a good job in the key work of people's livelihood, accelerate the progress of project construction, and achieve two hands, two mistakes, and two promotions. It is necessary to strictly and meticulously implement the daily prevention and control measures of construction sites, strengthen the management of construction personnel, establish the construction site into the account, and strictly implement the requirements of construction site personnel not going out unless necessary, killing engineering vehicles, and regular health inspections. It is necessary to seize the limited time before the winter break and stop work, optimize the construction plan, coordinate the scheduling of construction forces, and make every effort to catch up with the construction period, pay attention to safety, and ensure quality.
At the medical waste treatment site in Linxia City, He Dong inspected and understood the operation and daily treatment capacity of medical waste treatment. He demanded that the whole process should be done well in the collection and transfer of medical waste, timely collection and closed-loop transfer of all kinds of medical waste, efficient operation of treatment equipment, adhere to scientific potential mining, multi-measures to expand capacity, and effectively ensure the safe and efficient treatment of medical waste during the epidemic. To speed up the construction progress of the construction of medical waste treatment projects under construction, the leaders in charge of the prefecture and county should sink the front line, supervise and guide, coordinate and solve specific problems in a timely manner, and strive to be completed and put into use as soon as possible.
Responsible comrades of the state government office and the Linxia City and Linxia County governments participated in the investigation.
Reporter: Ma Jinzhong