Residents living in Nanchang City, Xihu District, Tatezhou Street 1 building in the home kitchen sewer often appear blocked, overflowing situation, although many times asked people to dredge, but it will not take long to block, the heart is very troubled. In desperation, residents reflected to the community cadres that they hoped to help solve this problem.
The community immediately contacted the comprehensive service department of the Xihu District City Appearance and Sanitation Evaluation Center to serve the masses and sent professionals to the scene for disposal. After repeated investigations, the cause of the blockage was finally found, which was a large amount of grease condensed lumps attached to the sewage pipes. To solve this problem, it is necessary to dredge the sewer pipe network of the entire building. The staff of the service department immediately coordinated the non-public enterprises in the area to provide corresponding dredging equipment and professional vehicles, dredged the sewers, and after more than 3 hours of hard work, finally dredged the sewer pipes connecting the municipal sewage pipe network. Residents of Building 1 of Tate chau Street said, "Thank you to the government for solving our problems and no longer have to worry about the sewer blockage." ”
Reporter Cai Yinghui