laitimes

Sun Gang, a member of the Hubin New Area, led a team to supervise and supervise the work of rectifying pollution such as a ditch

Sun Gang, a member of the Hubin New Area, led a team to supervise and supervise the work of rectifying pollution such as a ditch

【Text/Ding Ran】On the morning of October 25, Sun Gang, a member of the District Party Working Committee, led the responsible persons of the District Economic Development Bureau, the Environmental Security Bureau, Xiaodian and Jingtou Street to supervise the rectification and implementation of the 1143rd issue of the "Network Public Opinion Digest" of the Municipal Government Office.

Sun Gang and his party came to the canal Yaju to check the environmental sanitation and sewage treatment of the community, and there was a section of sewage in the drainage ditch on the east side of the community that had not been treated in time, and the scene required Xiaodian Street and the Xinyao Neighborhood Committee to attach great importance to it, deal with the environmental problems that the masses are concerned about in a timely manner, ensure that the rainwater and sewage in the community cannot be mixed, and ensure that the water quality of the drainage ditch on the east side of the community meets the standards.

At the pollution control site of ergan and one ditch, Sun Gang inspected the water quality of one ditch on the spot. It is required that the Economic Development Bureau of the second cadre and one ditch deputy river chief unit give full play to the leading role of the deputy river chief unit, conscientiously perform its duties, strengthen inspection, and timely deal with and hand over pollution problems to the river section long unit or enterprise, seriously solve it, and ensure that the water quality of one ditch meets the standards.

For the wellhead street, it is required to guard the general gate of the pollution problem of the two cadres and one ditch, and earnestly fulfill the territorial responsibilities. First, it is necessary to speed up the investigation of the source of sewage in the Jingtou block, and completely eliminate the mixed flow of rain and sewage at the source. Second, it is necessary to accelerate the transformation and construction of street sewage treatment facilities, comprehensively improve the treatment capacity and treatment quality of ecological treatment emergency pools, and ensure that discharge meets standards. Third, we must strengthen the control of dust, do a good job in environmental sanitation and dust control in the eastern section of Fuqian Street, and put an end to muck trucks and agricultural machinery bringing mud on the road.

(Source: Suqian Hubin New Area People's Government website) [Submission, regional cooperation, please send a private message or send a 3613378752 #qq.com within 24 hours to reply. 】

Read on