On October 18, He Wei, deputy secretary of the municipal party committee and mayor, led the heads of relevant departments to investigate the work of central heating in winter. He stressed that it is necessary to firmly establish the people-centered development thinking, always keep the masses' cold and warm in mind, make meticulous arrangements and strengthen services, do a solid and meticulous job in winter heating preparations, go all out to ensure the stable supply of heat sources, and ensure that the people are warm through the winter.

At the construction site of the branch line of Jinxin Community on Road No. 11 of Shanxi Aluminum Plant, He Wei learned in detail about the preparation of central heating work such as project construction progress, heating unit maintenance, and heating pipe network maintenance through on-site inspection, on-site inquiry, and listening to reports. This year, the city's central heating new access area of more than 800,000 square meters, mainly for the geothermal well community access to the central heating expansion project, is currently stepping up construction, to ensure this winter heating.
He Wei pointed out that the winter central heating is a major people's livelihood project and people's heart project that benefits thousands of households, and it is related to the vital interests of the people in the city. Relevant departments and heating enterprises should actively practice the people-centered development thinking, earnestly assume the first responsibility for ensuring heat supply, always keep the masses' cooling and heating in mind, make overall arrangements, coordinate linkage, comprehensive policies, strengthen safe production measures while doing a good job in operation management, strictly enforce various environmental protection indicators, and ensure the safe and high-quality operation of central heating work.
He Wei stressed that it is necessary to speed up the construction progress of the network expansion project, strictly control the quality and safety of the project, and complete the construction task on time, quality and quantity. It is necessary to dredge and maintain the heating pipe network in time, carefully check and solve the plugging points and leakage points in the operation of the pipe network, and take multiple measures to improve the quality of heating. It is necessary to conscientiously do a good job in staff training, respond to and solve the reasonable demands of the people on heating in a timely manner, and provide intimate services for the masses patiently, meticulously and civilizedly. It is necessary to strengthen daily scheduling management, implement dynamic monitoring of coal reserves, improve the level of refined management of heat supply, and strive to improve the heating temperature and quality in the shortest possible time after the start of central heating, and make every effort to ensure the safety and warmth of the people through the winter.
Source: Kawazu City Rong Media Center
Photo/Text: Shi Tiantian