Southeast network on April 18 (this network reporter Feng Xu intern Lai Ye period) planning approval is only a 9-story building, but in fact there is an extra floor, relevant information shows that the "10-story" building existed at the beginning of the building. Recently, the southeast network "Straight to Ping Shan" received a message from Mr. Lai, a netizen in Fuzhou, saying that he had complained about many twists and turns, and it was difficult to confirm whether the 9-story building with the roof structure changed in the cover was illegal.

Fuzhou Lijia World 9-storey building became "10 floors" (courtesy of netizens)
Is it illegal to change the roof structure? Netizens rushed to many sides for identification
Mr. Lai told reporters that in January 2018, he registered a hotel on the 9th floor of Lijia Grand World Shopping Mall in Gulou District, Fuzhou City, and invested more than 5 million yuan for decoration, and officially opened on July 20, 2018. By April 2020, due to complaints about the illegal construction of the hotel, the Fuzhou Municipal Public Security Bureau and the Gulou District Urban Management Bureau repeatedly investigated and collected evidence at the hotel, and pried open the ceiling on the spot, and found that the steel structure sandwich between the roof of the 9th floor and the "10 floors" at the top was found.
The Public Security Bureau asked the hotel to eliminate potential safety hazards, so Mr. Lai asked the landlord to solve the problem and did not renew the rent. Unexpectedly, in May last year, the landlord directly rushed the guest to lock the door and forcibly reclaimed the house. Mr. Lai suffered a huge loss. He provided the reporter with the relevant property rights certificate and building profile drawing, 9 floor plan, roof floor plan, etc., and the real estate property rights certificate showed that the 9th floor of Lijia World was for commercial use, with a construction area of 3516.12 square meters, which was a steel-concrete structure. Mr. Lai believes that the roof covering and the 9-storey roof have been changed to steel frame structures should be illegal and there are serious safety hazards. He hoped that the relevant departments could confirm it so that the landlord could be held responsible and recover his own losses.
Mr. Lai learned from "China Fujian" and "Fujian Police" and other WeChat public account articles that the types of houses in Fujian Province that are the key types of houses that are focused on rectification in fujian province include steel structure houses, especially steel structure production and operation houses that have not been formally designed and constructed, steel structure houses without qualification design and unqualified construction, houses with unauthorized layers or changes in load-bearing structures, and houses used for production and operation and rental, and if there are major safety hazards, they must be cleared, stopped, and sealed at the first time. Eliminate security risks in the first place. However, nearly a year after the incident, Mr. Lai consulted and asked for help everywhere, and issued a large number of appeals through letters and the Internet, and no unit made a clear reply on whether the 9th floor was an illegal building and whether there were any safety hazards.
The current situation of the 9-storey roof building (Photo by Feng Xu, a reporter of southeast network)
The 9-story building became "10 storeys" and already existed in 1998?
Recently, the reporter accompanied Mr. Lai to The Great World of Lijia at No. 186 Wuyi North Road. I saw that the 9th floor was already a hotel called "Aomori", and occasional tenants came and went. Several vents in the aisles revealed some pipes and wiring, some steel frames loomed inside, and some of the ceilings and walls had cracks and patch marks. "The top and walls, which used to crack and seep heavily, have now been repainted or wallpapered. We climbed in through the vent to take a picture and found that inside was a sandwich with a steel frame propped up! Mr. Lai said.
The reporter also came to the top of the 9th floor, only to see that there were many pipes and utilities such as motors and cooling towers, and a lot of building materials were piled up, and the ground was broken, looking messy and old. Behind these facilities are large areas of brick-concrete houses with multiple iron doors. A man was leading several workers to carry things up and down, the reporter came forward to inquire, the man denied that he was the owner of the "10th floor" house, said that he was just helping people clean things, and the rest did not know.
In the 12345 platform and related petition responses, Gulou District Antai Street Office, Gulou District Urban Management Bureau, Fuzhou Municipal Natural Resources and Planning Bureau and other units have repeatedly replied to the issue of 9-storey roof buildings in Lijia World. According to the relevant answers, Lijia Grand World Mall was built in 1997, the original building design was 10 floors above ground and 2 floors underground, and was changed to 9 floors above ground and 3 floors underground in 1997, and was completed and accepted in 1998. The roof layer planning function is the stairwell, elevator machine room, pressure stabilizing pump room, water tank and other public facilities, and the planning approval procedures for housing construction have not been handled, and the relevant planning approval procedures for addition and expansion have not been handled in the follow-up.
The urban management department inspected the scene and found that in addition to the public equipment room on the 9-storey roof of Lijia World, there was a single-storey brick-concrete structure building with an area of about 850 square meters. By looking at the 1998 image and vector drawings of the Fuzhou Survey Institute, the roof building of the building already existed at that time. On June 24, 2020, the Gulou District Urban Management Bureau investigated and dealt with the illegal establishment of the roof, but the relevant users sued the "Decision on Demolition within a Time Limit" made by the Bureau, and the Bureau is actively responding to the lawsuit.
Partial structural change of the 9-story roof (red part) (Photo by Feng Xu, a reporter of southeast network)
Construction drawings are difficult to query Relevant departments are discussing
How the 9th floor became "10 floors" is unknown, but during the interview with reporters, the relevant departments had no objection to the "10 floors" being illegally built. How to determine whether the 9 floors of the roof structure have been changed are illegal, and who determines it? Director Hou of the Office of Fuzhou Municipal Bureau of Natural Resources and Planning pointed out that the Natural Resources and Planning Bureau mainly determines whether the height, use, plot ratio, etc. of the building are in line with the planning and approval, and if the original plan of the building is 9 floors, from the perspective of the Bureau, the 9th floor is not illegal construction. As for whether its specific structure has been changed and whether the quality is qualified, it is up to the Construction Bureau to determine.
The person in charge of the Fujian Provincial Housing and Construction Department's Letter and Petition Office Xu surnamed Xu also told reporters that the natural resources planning department mainly examines whether the floor height and façade of the building are the same as the plan, and the urban management department determines whether it is illegal according to the situation determined by the planning department, and orders rectification of the illegal building or organizes forced demolition. The construction project in the construction process to change the structure, must perform the approval procedures, otherwise it is not according to the drawings of construction, there may be safety hazards, the local construction bureau can punish the construction unit.
That is to say, to uncover the mystery of the change of the roof structure of the 9-storey roof of Lijia World, the construction drawings and application documents for changing the structural design of that year are the key. However, Mr. Lai went to the Fuzhou Urban Construction Archives to inquire about the construction drawings of that year, but learned that the relevant drawings were no longer there. Zhao Gong of the Quality and Safety Supervision Department of the Fuzhou Urban and Rural Construction Bureau also told reporters that the bureau only kept the construction drawings for 10 years, and if Lijia World changed the structure at the beginning of the construction, then the drawing archives of 22 years ago must not exist.
"It is certainly not possible to change the structure without permission!" Zhao Gong pointed out that the construction project to change the structure must be formally drawn by the design institute, reviewed the drawings, and obtained construction permits; if the basis for changing the structure is found, the construction bureau will send a letter to the Municipal Housing Management Bureau, so that the property entrusts a qualified unit to identify the entire house and determine whether it is reliable in terms of safety of use.
At present, Mr. Lai's petition has been transferred from the Fuzhou Municipal Natural Resources and Planning Bureau to the Fuzhou Municipal Urban and Rural Construction Bureau, and the Quality and Safety Supervision Department of the Fuzhou Urban and Rural Construction Bureau has gone to the scene together with the staff of the Gulou District Urban and Rural Construction Bureau to inspect and discuss the next steps.
Source: Southeast Net