Quality Warranty for Housing Construction Projects (Model Text)
Employer (full name): ____________________________________________________________________
Cheng Bao (all names): ____________________________________________________________________
The employer and the contractor shall sign the project quality warranty certificate for the ________________________________________________ (full name of the project) in accordance with the People's Republic of China Construction Law, the Regulations on the Quality Management of Construction Projects and the Measures for Quality Warranty of Housing Construction Projects.
First, the scope and content of the project quality warranty
During the quality warranty period, the contractor shall bear the responsibility for the quality warranty of the project in accordance with the management provisions of relevant laws, regulations and rules and the agreement between the two parties.
The scope of the quality warranty includes foundation engineering, main structure engineering, roof waterproofing engineering, leakage prevention of toilets, rooms and external walls with waterproof requirements, heating and cooling systems, electrical pipelines, water supply and drainage pipelines, equipment installation and decoration projects, and other items agreed by both parties. The specific content of the warranty is agreed by both parties as follows____________________________________________
_____________________________________________________________________________________
___________________________________________________________________________________。
Second, the quality warranty period
In accordance with the Regulations on the Quality Management of Construction Projects and relevant regulations, the two parties agree that the quality warranty period of the project is as follows:
1. The foundation engineering and the main structure engineering are the reasonable service life of the project specified in the design documents;
2. The leakage prevention of roof waterproofing projects, toilets, rooms and external walls with waterproof requirements is ______________ years;
3. The decoration project is ____________ years;
4. ________________ years for electrical pipelines, water supply and drainage pipelines, and equipment installation projects;
5. The heating and cooling system is __________________ heating period and cooling period;
6. ________________ years for water supply and drainage facilities, roads and other supporting projects in residential areas;
7. The warranty period of other items is as follows:
_________________________________________________________________________________
_____________________________________________________________________________________
__________________________________________________________。
The quality warranty period is calculated from the date of acceptance of the completion of the project.
3. Quality warranty responsibility
1. For items that fall within the scope and content of the warranty, the contractor shall send someone to provide warranty within 7 days from the date of receipt of the warranty notice. If the contractor does not send someone to provide warranty within the agreed time limit, the employer may entrust another person to repair it.
2. In the event of an emergency repair accident, the contractor shall immediately arrive at the scene of the accident for emergency repair after receiving the accident notice.
3. For quality problems involving structural safety, it shall be reported to the local construction administrative department immediately in accordance with the provisions of the "Measures for Quality Warranty of Housing Construction Projects" and safety precautions shall be taken; The original design unit or the design unit with the corresponding qualification level shall propose the warranty plan, and the contractor shall implement the warranty.
4. After the quality warranty is completed, the employer will organize the acceptance.
Fourth, the cost of warranty
The cost of the warranty is borne by the party responsible for the quality defect.
5. Miscellaneous
Other project quality warranty items agreed by both parties: __________________________________________________
_____________________________________________________________________________________
__________________________________________。
The quality warranty of this project shall be signed by both the employer and the contractor of the construction contract before the completion and acceptance, and shall be attached to the construction contract, and shall be valid until the expiration of the warranty period.
Contractor (official seal): Contractor (official seal):
Legal Representative (Signature): Legal Representative (Signature):
Year-Month-Month-Day
Shanxi Taiyuan Chang Lawyer Key words:
Legal Advice, Professional Lawyer, Writing Complaints, Lawyer Consultation, Loan Disputes, Criminal Defense, Criminal Interviews, Release on Bail, Case Entrustment, Housing Leasing, Private Lending, Tort Disputes, Damages, Creditor's Rights and Debts, Legal Knowledge, Legal Knowledge, Legal Risks, Traffic Accidents, Contract Invalidation, Contract Termination, Third Party Revocation, Right of Revocation, Enforcement Objection, Enforcement, Judgment Debtor, Blacklist, Dishonest Person, Restricted Consumption, Equity Transfer, Company Business, Articles of Association, Partnership Disputes, Legal Counsel, Inheritance, Real Estate Inheritance, Testamentary Succession, Property Agreement, Joint Property, Property Division, Contract Law, Marriage Law, Divorce Disputes Divorce Agreement Divorce Case Litigation Representation Civil Dispute Hiring a Lawyer Contract Dispute Contract Review Contract Formation ......