[Source: Voice of Jilin]
According to the 2024 urban construction plan of Jingyue High-tech Zone, the upgrading and renovation project of Sakura Street will be implemented from July 25, including roadway renovation, drainage transformation, sidewalk connection project and other aspects.
Closed Sections:
Fully enclosed: Sakura Street (Ginkgo Road - Azalea Road), Kumquat Road (Sakura Street - Tulip Street)
Semi-closed: Sakura Street (Fufu Street-Azalea Road)
Closure time:
July 25--October 10
Directions:
North-south traffic on Sakura Street can be accessed from Optimus Street, Tulip Street and Juye Street, and will be open when the road section is completed.
East-west vehicles can pass from Fufu Road, Jinzhu West Road, Liuying West Road, Dujuan Road, and Yongshun Road, and the road section will be opened when it is completed.
Schematic diagram of road occupation
In the next step, Jingyue High-tech Zone will speed up the construction progress and return the road to the people as soon as possible. Passing vehicles and pedestrians are advised to choose a detour in advance and pay attention to traffic safety. We apologize for the inconvenience caused by road closures.
Article source: Reprinted · Jingyue Propaganda Department
Image source: Reprinted · Jingyue Publicity Department
Editors: Hao Zili, Zixin
Review: Hao Zili
Producer: Zhao Min, Zhong Xiao
Poke the small flower in the lower right corner to share it with more people
Disclaimer: The copyright of this article belongs to the original author, if there is a source error or infringement of your legitimate rights and interests, you can contact us by email, we will deal with it in a timely manner. E-mail address: [email protected]