2024 Chucheng Urban Construction Key Project Construction Plan (Continuation Project) | |||||||
Investment unit: 10,000 yuan | |||||||
serial number | The name of the project | Construction site | The content and scale of the construction | The start and end of construction | Source | Estimate the total investment | The company plans to complete the investment in 2024 |
Transportation: 7 items | |||||||
1 | Myeongguang General Airport | Guzhuang Village, Suxiang Town, Mingguang City | It is planned to construct 1 runway with a length of 1,200 meters and a width of 30 meters, and supporting the construction of aprons and related ancillary facilities. It is mainly used for tourism, logistics and transportation, flight teaching, agriculture and forestry operations, emergency rescue and other services in Mingguang and surrounding areas. | 2022.12-2024.12 | Funds issued by the financial funds of the higher capital districts | 29800 | 9000 |
2 | Tianchang General Airport | Tianchang City | The new runway is 1,200 meters long and has 26 parking stands, including 19 fixed-wing stands and 7 helicopter stands. It is mainly used for emergency rescue, air tourism, agriculture and forestry operations and other general aviation flight activities. | 2022.12-2026.03 | Self-funded | 40000 | 2000 |
3 | Chuzhou-Nanjing Intercity Railway (Chuzhou Section) Phase I Xuanhe Town Station to Provincial Boundary Section Adjustment Project (City Railway Phase III) | Chuzhou City | The first phase of Chuning Intercity Railway (Chuzhou Section) is 4.833km long, with 1 station, AC 25KV power supply system, 120km/h (reserved 140km/h) design speed, and fully elevated. The total investment of the project is about 1.862 billion yuan. | 2022.08-2025.12 | Bond issuance funds, loan funds | 186218 | 25000 |
4 | G36 Ningluo Expressway Lai'an to Mingguang Section Reconstruction and Expansion Project | Mingguang City, Nanqiao District, Langya District, Lai'an County | The total length of the project is 72.275 kilometers, which has been reconstructed and expanded from the current two-way four-lane expressway with a design speed of 120 km/h to a two-way eight-lane expressway with a design speed of 120 km/h. | 2021.01-2024.12 | Loan rescue funds | 632832 | 226500 |
5 | S14 Chuzhou-Hefei Expressway | Nanqiao District, Quanjiao County | A new 22.5-kilometer expressway will be built at the intersection of S12 Chuhuai Expressway and S94 Chuzhou West Ring Expressway, and it will be laid out from east to west. It is connected to the S18 Hezhou Expressway from Hefei to Shouxian in the west. | 2023.01-2025.09 | Loan Funds | 283400 | 90000 |
6 | S98 Chuzhou West Ring Expressway Shiji Interchange (Langya Mountain) | 南谯区 | The new B-type single horn service-type interchange is located at K4+190 of Chuzhou West Ring Expressway, which is connected to the planned S322 | 2023.06-2025.06 | Funds for bond issuance | 25000 | 15000 |
7 | G328 Suburban to Chihe Section of the First Class Highway Reconstruction Project (Nanqiao Section) | 南谯区 | The two-way four-lane first-class highway has a total length of 24.4 kilometers. Roadbed, bridges and culverts, pavement, traffic engineering, etc | 2021.09-2025.12 | Higher-level funds, municipal and district financial funds | 160000 | 35000 |
Municipal road network, bridges: 13 items | |||||||
8 | Qinglang Bridge (Jiangjun Mountain Road and Bridge Project) | Lingqing District | The main line starts from Xijian Road in the south (about 330m away from the intersection of Nanqiao North Road). The starting point column number K0+140 crosses the intersection of Nanhe North Road and Xijian North Road, Beijing-Shanghai Railway, and planned embankment road to the north, crosses the Qingliu River, and the end point K1+280 is connected with the planned Huaihe Road. The total length of the main line is 1140m, of which the bridge length is 904.6m, and the rest is the roadbed section. | 2022.09-2024.08 | Municipal Treasury Funds | 42000 | 2000 |
9 | Qingliu River Jiuzi Bridge and Connecting Line Project | Sino-Singapore Suchu High-tech Zone | The new Jiuzi Bridge has a total length of 16 kilometers, a road width of 45.6 meters, a total length of 875 meters for the main line bridge, and the rest is a connecting road project | 2021.03-2024.10 | Self-funded | 31000 | 7000 |
10 | Huifeng Road across the Qingliu River Bridge was repaired and reinforced | City | The superstructure of the main bridge is demolished and reconstructed, the main pier and the transitional pier cap are reconstructed, the approach bridge disease, sidewalk, bridge deck pavement is repaired and reconstructed, and the supporting lighting and greening are provided. traffic safety ancillary facilities, etc. | 2023.10-2025.04 | Municipal Treasury Funds | 9200 | 8000 |
11 | Quanjiao Road (Longxing Road, South Auxiliary Road, Chuyang Road) | 南谯区 | The road is 2,350 meters long and 44 meters wide, and the main construction content is roads, rain and sewage, street lights, greening and traffic auxiliary facilities. | 2023.12-2024.12 | Municipal Treasury Funds | 8700 | 8000 |
12 | Supporting road project around Bali plot (Daoxiang Road) | 南谯区 | The project starts from the planned road on the south side of No. 8 Middle School and ends at Yongfeng Road, with a total length of 400 meters and a width of 36 meters on the red line of the road. | 2023.09-2024.05 | Municipal Treasury Funds | 1700 | 600 |
13 | Fengxiang East Road, north side of the second phase of Qinglang Villa | 南谯区 | On the south side of the first phase of the Qinglang Annex, on the north side of the second phase of the Qinglang Annex, the east extension of Fengxiang Road is about 260m and the width is about 20m | 2023.12-2024.05 | Municipal Treasury Funds | 800 | 600 |
14 | Wuyue plate by the road project (Jingzi Road - Renmin East Road) | Minghu New Area | It is about 320 meters long and 15 meters wide. | 2023.09-2024.12 | Municipal Treasury Funds | 720 | 400 |
15 | Chuzhou Middle School South Plot Planning Branch Road (Yangming Road-Renhe Road) | Minghu New Area | It is about 480 meters long and 15 meters wide. | 2023.09-2024.12 | Municipal Treasury Funds | 1100 | 500 |
16 | Kangyang Town has two roads and three roads | Minghu New Area | Guier Road is about 1,710 meters long and 24 meters wide, Chuzhou Avenue to Guiyi Road, and 50 meters of bridge. Guisan Road is about 250 meters long and 24 meters wide, from Minghu Avenue to Guier Road. | 2023.09-2024.12 | Municipal Treasury Funds | 8500 | 6000 |
17 | The exhibition plot passes through the road | Minghu New Area | It is 680 meters long and 30 meters wide, with two carriageways. | 2021.10-2024.12 | Municipal Treasury Funds | 2200 | 1000 |
18 | The exhibition plot passes through the second road | Minghu New Area | It is 430 meters long and 24 meters wide, with two carriageways. | 2021.10-2024.12 | Municipal Treasury Funds | 1100 | 600 |
19 | Exhibition plot Weiyi Road | Minghu New Area | It is 760 meters long and 24 meters wide, with two carriageways. | 2021.10-2024.12 | Municipal Treasury Funds | 1800 | 800 |
20 | Exhibition plot Wei 2nd Road | Minghu New Area | It is 760 meters long and 15 meters wide, with two carriageways. | 2021.10-2024.12 | Municipal Treasury Funds | 1250 | 600 |
Urban Enhancement Category: 22 items | |||||||
21 | The construction project of the urban renewal demonstration area of the old city | Langya Avenue, Nanqiao Road, Qingliu Road, Xidong Road and Xidong Road cover an area of about 1.9 square kilometers | Implement the project construction in 10 aspects: improving public service facilities, renovating old communities, activating the urban economy, optimizing road traffic, improving the green space system, building a slow traffic system, transforming sponge communities, improving municipal facilities, applying smart technology, and shaping characteristic features. Note: Including the construction project of the old city urban renewal demonstration area implemented by the municipal key department (the transformation of Langya Party School and the transformation of Ziwei Food City) | 2022.01-2024.12 | Financing (Loan) Funding (Urban Renewal Financing) | 170000 | 50000 |
22 | Resettlement housing construction projects | Langya District, Nanqiao District | Changsheng Garden, Xijian Garden Phase III, Lingxi Garden Phase II, Northwest of Beihu, Old Timber Company, Jianbei Park, Kendia Plot, Yongle West Garden, Xijian Garden Phase IV, Qinglang Courtyard Phase II, Nanyang County, and other 11 resettlement houses have been constructed (among them, the Old Timber Company and Kendia Plot have completed the resettlement and allocation, and are currently promoting the preliminary work of the project construction.) ) | 2023.10-2026.12 | Loan funds, bond issuance funds | 911644 | 300000 |
23 | Comprehensive renovation of historical and cultural districts in the old city (North Street, Jingang Lane) | Old | It includes the comprehensive renovation of North Street A and B, Jingang Lane A and B, and official buildings. | 2021.01-2024.12 | Funds for bond issuance | 28000 | 1000 |
24 | Urban lifeline safety engineering construction project | City | The Chuzhou City Lifeline Safety Monitoring Center was newly built to carry out overall monitoring and dynamic physical examination of gas, water supply, bridges and drainage systems through the installation of sensors, so as to prevent and curb the occurrence of major safety accidents in the urban public sector. | 2022.01-2025.12 | Loan funds (urban renewal financing) municipal financial funds | 100000 | 20000 |
25 | Urban charging and hydrogen energy infrastructure construction | City | Improve, construct and operate the charging (hydrogenation) infrastructure that has been built, is under construction and newly built in the urban area (in 2024, it is planned to build 15 new energy vehicle charging stations in the main urban area, actively cooperate with external famous enterprises to build 1-2 comprehensive demonstration stations for optical storage and charging (including supercharging), and improve the digital capabilities of the "Chuzhou Charging" operation and management platform) | 2022.11-2024.12 | The superior is self-funded | 3000 | 2000 |
26 | Earthquake disaster prevention and management project | Chuzhou City | Cities and counties along the Tanlu fault zone and places with conditions are selected to carry out seismic active fault detection, seismic zoning, and seismic damage prediction, comprehensively promote the regional seismic safety assessment of the main functional areas of Nanqiao-Pukou and Dingshan-Xianhe, so as to provide a scientific basis for the comprehensive utilization of land and the overall planning of the city, and provide seismic reinforcement technical services for new reconstruction and expansion construction projects, lifeline projects, and secondary disaster risk sources, so as to improve the "four most" business environment. Collect and sort out the basic data of earthquake safety, seismic active fault detection and risk assessment data, seismic disaster risk investigation and pre-assessment data of construction projects in Chuzhou City, and comprehensively use 3D visualization, GIS, remote sensing, virtual reality and graphic image processing technologies to build a data service platform for earthquake disturbance and fortification of construction projects in Chuzhou City. | 2022.01-2025.12 | Municipal Treasury Funds | 730 | 400 |
27 | In 2023, the resettlement community such as the Entrepreneurship Garden will meet the standards and improve the project | City | Langya District and Nanqiao District Binhu Community, Sanliting People's Family, Ruyi People's Family, Longpan Nanyuan and other residential areas elevators, roof exterior walls, secondary water supply and other issues for maintenance and transformation. | 2023.12-2024.12 | Municipal Treasury Funds | 1500 | 600 |
28 | 2023 Municipal Infrastructure and Urban Parks and Roads Green Space Enhancement Project | City | 1. Medium repair, security and maintenance engineering; maintenance and repair of municipal infrastructure such as roads, drainage, bridges, etc., with a total investment of 23 million; 2. Municipal road drainage comprehensive renovation project: the total investment of municipal road rain and sewage mixed investigation and remediation is 10 million; 3. Urban parks and road green space management improvement projects; Bid 1: Minghu Avenue, Zuiweng Road and other road greening improvement: Bid 2: "Urban Green Space System Planning", "Urban Green Line Planning", "Urban Greenway Planning" three green-related special planning preparation, with a total investment of 5 million. | 2023.06-2024.06 | Municipal Treasury Funds | 3800 | 3000 |
29 | Drainage network unblocking project | City | Hengxing Road, Chuyang Road, Longpan Avenue and other rain and sewage pipe networks are connected | 2023.12-2024.06 | Municipal Treasury Funds | 1500 | 1200 |
30 | Relocation and reconstruction project of drainage facilities of residential project on the northeast side of the intersection of Jinling Road and Zuiweng Road | City | 4 culverts on Jinling Road and 1 culvert on Dongpo Road were relocated | 2023.12-2024.06 | Municipal Treasury Funds | 600 | 500 |
31 | Chuzhou Emergency Command Material Reserve Center | The northwest side of the intersection of Zhongdu Avenue and Minghu Avenue | The project covers an area of about 23 acres and a construction area of about 34,000 square meters. | 2022.06-2024.10 | Self-funded | 19000 | 10000 |
32 | treasury | Longpan Avenue and Quanjiao Road intersection and southwest side | Vaults, commercial facilities, ancillary buildings, etc., with a construction area of about 22,000 square meters. | 2022.05-2024.12 | Self-funding | 15000 | 5000 |
33 | Data Building | Longpan Avenue and Renhe Road intersection and southwest side | Civil engineering, installation, ancillary works, etc., with a construction area of about 34,000 square meters | 2021.10-2024.03 | Self-funded | 25000 | 6000 |
34 | Municipal rule of law publicity and education base construction project | Chuzhou Olympic Sports Center Stadium | The construction site of the project is located in the commercial site on the south side of the first floor of the east area of the Olympic Sports Center Stadium in Chuzhou City, with a total area of about 2,400 square meters, with a number of theme exhibition areas and functional halls, through sound, light, electricity and intelligent equipment and other means, to display and publicize the content and effectiveness of the city's national law popularization work. | 2023.09-2024.03 | Municipal Treasury Funds | 700 | 500 |
35 | Minghu Police Station of Chuzhou Public Security Bureau | Minghu New Area | The total land area is about 14 acres, with a new police station and guard room, with a total construction area of about 3,200 square meters, supporting the construction of outdoor venues, roads, greening and other ancillary facilities. | 2023.12-2025.06 | Municipal Treasury Funds | 2000 | 1800 |
36 | Integrity culture and education base | West of Dongpo Road, Chuzhou City | Renovation, decoration and construction of ancillary facilities | 2023.05-2024.12 | Municipal Treasury Funds | 9500 | 5000 |
37 | The second phase of the special service fire station and training base | High-speed rail station area | Business buildings and supporting facilities, sports grounds, etc | 2022.11-2024.12 | Municipal Treasury Funds | 9800 | 3000 |
38 | Longwei Mountain Forest Environmental Climate Monitoring Station (Chuzhou New Generation Weather Radar) Project | Langya Mountain State-owned Forest Farm, Longwei Mountain Forest Fire Prevention Tower | The construction content includes forest fire prevention lookout (radar building, forest fire prevention lookout platform, radar equipment room, forest environment climate monitoring station and related supporting infrastructure, with a planned construction area of about 5,559 square meters and a tower height of about 99 meters. | 2023.03-2026.05 | Superior funds, municipal financial funds | 5600 | 4000 |
39 | Fire protection renovation of the Municipal Science and Technology Museum | Municipal level | Carry out fire rectification of the Municipal Science and Technology Museum, specifically for fire rectification construction, testing and evaluation. | 2023.10-202401 | Municipal Treasury Funds | 200 | 150 |
40 | Chuzhou North Railway Station Freight Yard Reconstruction and Expansion Project | Lingqing District | The new land of Chuzhou North Railway Station Freight Yard is 72.6 acres, the reconstruction of the moisture-sensitive cargo area and the military loading line, the new container and bulky cargo operation area, the demolition and construction of relevant railway houses, the reconstruction of the freight yard access channel, and the demolition of 3 existing cargo lines (covering an area of about 54.87 acres) | 2022.09-2024.06 | Municipal Treasury Funds | 17000 | 7000 |
41 | Longpanhe Park Phase III Project | Chengnan District | Landscape stacking, public toilets, shore release, greenways, dredging, management rooms, etc. | 2023.10-202406 | Funds for bond issuance | 13000 | 2500 |
42 | Hengfeng Road and other seven road greening projects | Minghu New Area | Seven roads in Minghu New Area have been greened. (including: Hengfeng Road, Wanshuiqiao Road, Yangming Road, Minghu Avenue, Hengxing Road), Renhe Road, Renyi Road). | 2023.02-202409 | Special Bond Funds | 4200 | 500 |
People's livelihood: 3 items | |||||||
43 | Chuzhou No. 2 Welfare Institute | The southwest side of the intersection of several sample roads and Jinling Road in Nanqiao District, Chuzhou City | Covering an area of about 30 acres, the welfare home with 500 beds for the elderly includes 3 maintenance buildings and 1 emergency rescue complex building (including comprehensive service functions), and supporting the construction of outdoor roads, water supply and drainage, power supply, fire protection, greening comprehensive pipelines and other public auxiliary projects, with a total construction area of about 32,550 square meters. | 2022.12-2024.08 | Superior funds, municipal financial funds | 10000 | 6000 |
44 | Chuzhou Nursing Center | The southwest side of the intersection of Jingzi Road and Jinling Road, Nanqiao District, Chuzhou City | Covering an area of about 28 acres, the main new pension beds are 512, integrating medical treatment, elderly care, health care, rehabilitation, nursing and other elderly care centers. It mainly includes 4 maintenance apartments, and supporting the construction of outdoor roads, water supply and drainage, power supply, fire protection, greening, comprehensive pipelines and other public auxiliary projects. The total construction area is about 28,750 square meters. | 2022.12-2024.08 | Municipal Treasury Funds | 9200 | 5200 |
45 | Ziwei Road Park and Fengyang Road National Fitness Outdoor Activity Base Project | Chengnan District | Including badminton, table tennis, basketball and other sports venues, children's amusement, elderly activities and other leisure venues, with related greening, sketches, lighting facilities, etc | 2023.10-2024.09 | Municipal Treasury Funds | 2300 | 2000 |
Education: 13 items | |||||||
46 | Future College of Anhui University of Science and Technology | Higher Education Science and Technology Innovation City | The total land area is about 750 acres, the total construction area is about 330,000 square meters, and one university is planned to be built. | 2022.10-2026.12 | Self-funded, loan funds, bond issuance funds | 305000 | 120000 |
47 | Anhui Radio and Television University Chuzhou Branch New Campus Construction Project | Xijian Road and Drunkard Road intersect and mouth | The project covers an area of about 60 acres. The total construction area is about 35,000 square meters, including teaching buildings, information buildings, education service centers, comprehensive buildings, lecture halls, etc. | 2023.02-2024.12 | Funds for bond issuance | 24500 | 14500 |
48 | Experimental Training Center for Integration of Industry and Education at Huifeng Campus of Chuzhou University | Chuzhou University Huifeng Campus | The experimental training center for the integration of industry and education has a construction area of about 38,500 square meters, including 30,000 square meters and 8,500 square meters underground | 2022.09-2024.09 | The central government raises its own funds | 15000 | 10000 |
49 | Building 15/16 of the student dormitory of Huifeng Campus of Chuzhou University | Chuzhou University Huifeng Campus | Two student apartments with a total area of about 16,000 square meters | 2023.11-2025.03 | Self-financing and bond issuance funds | 6900 | 6000 |
50 | Chuzhou No. 5 Middle School Expansion Project | Langya West Road and Zhongdu Avenue intersection | The land acquisition is about 65 acres, with 42 classes planned and a total construction area of 36,000 square meters, mainly for the construction of teaching buildings, comprehensive buildings, laboratory buildings, libraries and other main projects, as well as canteens, sports fields and other supporting projects. | 2020.11-2024.09 | Municipal and district financial funds | 13500 | 5000 |
51 | Yongsan Elementary School | The northeast side of the intersection of Fengyang Road and Longpan Avenue | About 60 acres of land will be acquired, 36 teaching classes will be planned, with a construction area of about 23,000 square meters, new teaching and auxiliary buildings will be built, and supporting ancillary facilities and equipment will be purchased. | 2023.10-2025.02 | District Treasury Funds | 11500 | 10000 |
52 | Su Chu is two small | Suchu Park | It covers an area of about 73 acres, with a total construction area of about 29,000 square meters, and is now divided into 48 teaching classes. New teaching and auxiliary buildings will be built, and ancillary facilities and equipment will be built. | 2022.07-2024.08 | District Treasury Funds | 14500 | 7000 |
53 | Chuzhou No. 2 Primary School East Campus New Project | No. 371, Fenghuang East Road | The East Campus will be constructed according to the scale of 36 classes, with a construction area of about 17,000 square meters for new construction, renovation and expansion, and supporting the construction of outdoor ancillary projects and the procurement of facilities and equipment | 2023.10-2025.09 | Municipal and district financial funds | 12000 | 10000 |
54 | Crape Myrtle Primary School Expansion Project | The intersection of Zhongdu Avenue and Qingliu Road | The campus will be expanded to the north and land will be acquired, and new teaching buildings, comprehensive buildings, underground parking lots and other buildings will be built. With an area of about 15,000 square meters, the original school building is renovated, ancillary works and equipment procurement and installation | 2023.10-2025.09 | Municipal and district financial funds | 9000 | 6000 |
55 | Langya Road Primary School Reconstruction and Expansion Project | 69 Sanliting Road | The expansion land is about 5 acres, with a new practice building, wind and rain playground and underground garage, with a construction area of about 8,600 square meters, as well as the renovation of the original school building, ancillary projects, facilities and equipment procurement and installation, etc | 2023.07-2024.08 | Municipal and district financial funds | 4500 | 3500 |
56 | Chuangye Road Primary School Expansion Project | Northeast of the intersection of Chuangye Road and Huifeng Road | 17 acres of land, after the land acquisition of the school covers a total area of about 32 acres, the overall planning and expansion of the school, according to the scale of 18 teaching classes, the new teaching and auxiliary buildings of about 9,500 square meters, while supporting the construction of outdoor ancillary facilities. | 2022.10-2024.08 | Municipal and district financial funds | 4750 | 2500 |
57 | The second phase of the expansion of Huxin Road Primary School in Chuzhou City | West side of Huxin Road Primary School | 12 acres of land were acquired, with a comprehensive building of 4,037 square meters, a sports field of 5,180 square meters, and an underground parking lot of 3,980 square meters. | 2023.12-2024.12 | Municipal and district financial funds | 4000 | 3500 |
58 | Jiepai Kindergarten | The southeast side of the intersection of Jiepai Road and Fuxi Road | A new kindergarten covers an area of 9,914 square meters, with a construction area of about 8,000 square meters and 18 classes. | 2023.12-2025.04 | Municipal Treasury Funds | 4000 | 3000 |
Medical and health category: 3 items | |||||||
59 | Expansion project of the north courtyard of the first hospital of the city | No. 12, Zhongyou Lane, Gulou Street, Langqiu District | The construction area is 33,000 square meters (including basement), and the above-ground construction area is 23,000 square meters. The underground construction area is about 10,000 square meters. The building has four floors above ground and one floor underground, and the building height is 18 meters. The total investment is about 350 million yuan. The construction content is outpatient clinics, emergency first aid, related medical and technical departments, restaurants, underground parking and greening construction, etc., and the purchase of related equipment (including medical equipment) | 2023.10-2025.10 | Self-raised funds for bond issuance | 35000 | 10000 |
60 | Chuzhou Stomatological Hospital Construction Project | Former Children's Hospital Phase I Building (No. 105 Zuiweng West Road) | With a total area of about 8,000 square meters, it is planned to be equipped with a total of 60 dental chairs, 40 beds, 2 operating rooms, a charging office, a pharmacy, an inspection and disinfection supply room, an imaging center, a negative pressure computer room, an office area, a remote consultation center, a small multi-functional hall, a teaching room, etc. It is mainly for the renovation of the original building, indoor and outdoor decoration, including water and electricity, intelligence, HVAC, elevators, fire protection, medical gases and other renovation contents and the purchase of related medical equipment. | 2023.01-2024.05 | Municipal Treasury Funds | 10000 | 8000 |
61 | Chuzhou Center for Disease Control and Prevention Comprehensive Business Building Project | The south side of Drunken Weng Road and the east side of Renyi Road | It covers an area of about 23 acres: the construction area is 28,549.43 square meters, including the underground area of 5,865.69 square meters, including 9,782.49 square meters of laboratory building, 7,006.17 square meters of business building, 5,767.30 square meters of emergency command center building, 78.72 square meters of guard room 1, and 49.06 square meters of guard room 2. | 2022.03-2024.06 | Superior funds, municipal financial funds | 21000 | 10000 |
Environmental protection: 6 items | |||||||
62 | Chuzhou Triangle Integration Demonstration Zone Water Supply Guarantee Project | Quanjiao County, Nanqiao District | Water intake engineering, water conveyance engineering, pressurized pumping station, etc. | 2022.12-2025.12 | Funds for bond issuance | 250000 | 60000 |
63 | Chuzhou Qingliu River Water Storage Control Project | 南谯区 | A large barrage structure will be built to block and store clear river water, improve the regional water ring, and create a water ecology | 2022.01-2024.01 | Funds for bond issuance | 24000 | 7000 |
64 | Chuzhou Fourth Water Expansion Project | Lingqing District | The daily water supply capacity of the fourth waterworks was expanded from 150,000 cubic meters to 200,000 cubic meters. | 2023.08-2024.06 | Self-funded | 5300 | 3000 |
65 | Phase III Expansion Project of the Second Sewage Treatment Plant | 799 Suzhou South Road | Expanded from the current daily treatment of 100,000 tons of domestic sewage to 150,000 tons of daily sewage treatment. | 2022.12-2024.06 | Self-funded | 25000 | 8000 |
66 | Huifeng Road Canal and Lai'an Road Outlet Storage Tank Upgrading and Renovation Project | Huifeng Road Canal and Lai'an Road Outlet | The two storage tanks in the existing open air were renovated and upgraded to purify the water quality and eliminate the impact of odor on the production and life of surrounding residents. | 2023.08-2024.01 | Funds for bond issuance | 4000 | 1600 |
67 | Construction project of medium-sized transfer station for domestic waste | Southeast of the intersection of Jinling Road and Tongle Road | 1 new 400t/d medium-sized garbage transfer station, including the main station of the garbage transfer station, management service room, garbage transfer compression equipment, weighing system, deodorization and fresh air system, leachate pretreatment system: transfer vehicles, internal water supply and power supply, smart dispatching center, road transportation, greening, etc. | 2022.12-2024.06 | Municipal Treasury Funds | 4100 | 2000 |
#长文创作激励计划#