laitimes

Yin Li and Yin Yong went to Fangshan District to inspect the post-disaster recovery and reconstruction work

author:Beijing News

According to Beijing Daily, on the morning of May 17, Yin Li, secretary of the municipal party committee, went to Fangshan District to inspect the post-disaster recovery and reconstruction work and promote flood preparations. He stressed: As a result of continuous struggle, phased progress has been made in various reconstruction tasks, and the order of the masses' production and life has basically returned to normal. This year marks the 75th anniversary of the founding of the People's Republic of China, and we must thoroughly implement the spirit of General Secretary Xi Jinping's important instructions on flood prevention and disaster relief, anchor the goal of "basic recovery in one year, comprehensive improvement in three years, and long-term high-quality development", continue to further promote various key tasks, promote the comprehensive recovery and upgrading of disaster-stricken areas, and create a safe, livable and beautiful home for the people. Yin Yong, deputy secretary of the municipal party committee and mayor, inspected together.

Yin Li and Yin Yong went to Fangshan District to inspect the post-disaster recovery and reconstruction work

Learn about the city's water-damaged road restoration and reconstruction work

The main body of the repair project of the Bangezhuang Bridge in Fozizhuang Township, the double line of National Highway 108 has been completed, and the flood capacity of the bridge has reached the standard of once in a century. The city leaders inspected the repair of the bridge and listened to the progress report on the restoration and reconstruction of the city's water-damaged roads. Yin Li pointed out that the mountain road network is a key facility for personnel evacuation and golden rescue in times of emergency. Before the flood, it is necessary to pay close attention to the time node, complete the repair of damaged roads on time, and restore normal traffic capacity. Accelerate the construction of new highway projects, open up the main channel of the "three horizontal and three vertical" road network in the western mountainous area, and improve the coverage and accessibility of the road network in the whole area. Moderately improve the design level of road safety resilience in mountainous areas and enhance flood resistance.

Yin Li and Yin Yong went to Fangshan District to inspect the post-disaster recovery and reconstruction work

Inspect the progress of the restoration of the river and surrounding facilities

At present, 80% of the water damage restoration project of the Dashihe River has been completed, and it is planned to be fully completed by the end of May. Municipal leaders came to the Heilongguan section of the Dashihe River to inspect the progress of river restoration and understand the restoration and reconstruction of the city's water facilities. Yin Li demanded that the investment in manpower and equipment be increased to ensure that all dredging is completed before the flood and the flood function of rivers at all levels is restored. Scientifically do a good job in hydrological monitoring and the construction of a digital twin river basin system, and improve the level of intelligent scheduling of flood control projects. The ecological restoration of rivers and the construction of roads and bridges should be combined with the implementation of the rural revitalization strategy, and the parking facilities and viewing and rest platforms along the coast should be scientifically planned and designed, so as to create a water environment with clear water and green banks and natural symbiosis, so as to help the development of the rural tourism industry.

Yin Li and Yin Yong went to Fangshan District to inspect the post-disaster recovery and reconstruction work

It is required to combine the recovery and reconstruction work with the implementation of the rural revitalization strategy

After the disaster, Beicheying Village, Qinglonghu Town, realized the resettlement of villagers through alternative site selection and homestead translational replacement, and all 90 houses built in advance have been structurally capped. Municipal leaders came to the site of the homestead translation project to understand the overall situation of the project and the progress of post-disaster recovery and reconstruction in Fangshan District. Yin Li pointed out that it is necessary to speed up the construction of reconstructed housing, ensure that it is completed on time and as planned, and help the people in the disaster area move into new homes and start a new life as soon as possible. Focusing on the needs of the people's lives, we will coordinate the design of architectural style, functional layout, safety and resilience and other elements, and build supporting facilities such as parking spaces, so that the new home can become a high-quality home that can retain green mountains and clear waters, remember nostalgia, and live a comfortable and convenient life.

Yin Li and Yin Yong went to Fangshan District to inspect the post-disaster recovery and reconstruction work

The site of the homestead translation project in Beicheying Village, Qinglonghu Town

Yin Li pointed out during the inspection that it is now less than half a month away from the flood, and various tasks have entered the final stage of sprinting. It is necessary to keep an eye on the progress, reverse the construction period, and complete the pre-flood restoration and reconstruction tasks on time and with good quality. In the reconstruction of houses, it is necessary to control the quality of materials and construction, listen to the opinions of the masses, respect the wishes of the masses, do a good job in supporting facilities and public services, and build the new homes into a safe, comfortable and livable life model. River dredging should improve the disposal speed, and do a good job in the disposal and utilization of dredging sand and gravel. Strengthen construction safety management and do a good job in the acceptance of completed projects.

Yin Li emphasized that it is necessary to implement the three-year function improvement task with high standards. The system improves the flood control standards of the river basin, coordinates the upstream and downstream, left and right banks, and main and tributaries, strengthens the construction of comprehensive river management, hydrological monitoring and digital management systems, and accelerates the preliminary work of key river reservoir control projects. Improve the layout of the road network in mountainous areas, and start the construction of the 108 new line expressway and the Laibao Road new line expressway. Combined with the "Hundred Thousand Project" and the "Peacetime and Emergency Dual-use" functional construction, strengthen the resilience and functional design of schools, hospitals, culture, elderly care, sports and other facilities in mountainous areas, and create an efficient and convenient public service system on the basis of safety. Do a solid job in the preliminary work of the project, and improve the efficiency of examination and approval on the basis of in-depth scientific demonstration. It is necessary to strictly ensure the progress of the implementation of the additional treasury bond issuance projects and strengthen the management of the use of funds.

Yin Li stressed that it is necessary to tighten and consolidate the responsibilities of all parties. All departments at all levels adhere to the idea of "a game of chess", strengthen cooperation, and form a joint force. The working groups strengthened overall planning and coordination, relevant departments took the initiative to step forward to improve the efficiency of project promotion, and the disaster-stricken areas of Fangshan, Mentougou and Changping shouldered their territorial responsibilities and organized and promoted the implementation of various tasks in a strong and orderly manner. All assistance districts and municipal state-owned enterprises should adjust the methods and content of assistance in a timely manner in light of actual conditions, and provide effective and continuous assistance. Leading cadres at all levels have taken the initiative to take the initiative to do good things well and satisfy the masses. Discipline inspection and supervision departments have intensified supervision and inspection to ensure sunshine and clean reconstruction.

Yin Li put forward requirements for this year's flood preparedness work, he stressed that it is necessary to make full use of the results of the review of the "23.7" extreme heavy rainfall, comprehensively strengthen the investigation of hidden dangers in key areas such as mountain ditches, geological disaster hidden danger points, dangerous villages and households, and water-wading scenic spots, implement various flood prevention measures, and eliminate risks and hidden dangers in a timely manner. Improve all kinds of emergency plans, and do a good job in flood control material reserves and emergency communication support. Strengthen the skills training and actual combat drills of the emergency rescue team, enhance the people's awareness of emergency avoidance and self-rescue and mutual rescue capabilities, and effectively build a strong line of defense to ensure safe flooding.

Xia Linmao, member of the Standing Committee of the Municipal Party Committee and executive vice mayor, and Zeng Jin, member of the party group of the municipal government, participated.

Edited by Chen Yanting

Job

Read on