#天津高速路况#
2024-5-15 18:04,
G18 Rongwu Expressway to Rongcheng direction K735+000, to Wuhai direction K709+000,
G25长深高速驶往深圳方向K1082+800处,驶往长春方向K1097+000处、K1068+000处,
The construction of the S1 Jinji Expressway Dalinghou Tunnel to Beijing and the Lianhualing Tunnel to Beijing has been completed, and the traffic has returned to normal.
5-15 18:04, G18 Rongwu Expressway, G25 Changshen Expressway, S1 Jinji Expressway part of the construction has ended, traffic back to normal 5-15 18:04, G18 Rongwu Expressway, G25 Changshen Expressway, S1 Jinji Expressway part of the construction has ended, traffic back to normal 5-15 18:04, G18 Rongwu Expressway, G25 Changshen Expressway, S1 Jinji Expressway part of the construction has ended, traffic back to normal