laitimes

The main bridge of the Fuxing Avenue cross-Jianghan Canal Bridge project was completed and opened to traffic

author:Jingzhou News Network
The main bridge of the Fuxing Avenue cross-Jianghan Canal Bridge project was completed and opened to traffic

Video: The main bridge of the Fuxing Avenue cross-Jianghan Canal Bridge project was completed and opened to traffic

Today (May 1), the main bridge of Fuxing Avenue across the Jianghan Canal Bridge was officially completed and opened to traffic.

The main bridge of the Fuxing Avenue cross-Jianghan Canal Bridge project was completed and opened to traffic

Fuxing Avenue cross-Jianghan Canal Bridge is an important passage connecting Jingzhou High-tech Zone to the central urban area, in an east-west direction, connecting Fuxing Avenue in the east and Fuxing Avenue in the west, with a design speed of 80 kilometers per hour, a total length of about 700 meters, and a standard road width of 70 meters, which is a two-way six-lane + non-motorized lane + non-common board.

The project is mainly composed of steel bridge deck, steel tower, cable-stayed cable, ladder bridge and concrete ramp bridge.

The main bridge of the Fuxing Avenue cross-Jianghan Canal Bridge project was completed and opened to traffic

The project started in April 2022, and the main bridge deck was widened from 19 meters to 70 meters, changing from 2 lanes in both directions to 6 lanes in both directions, greatly improving the road carrying capacity of Jingzhou High-tech Zone.

The main bridge of the Fuxing Avenue cross-Jianghan Canal Bridge project was completed and opened to traffic

The main bridge of Fuxing Avenue across the Jianghan Canal Bridge has been completed and opened to traffic, opening up the east-west "artery" of the main urban area of Jingzhou, attracting more development elements to gather in Jingzhou High-tech Zone, and providing solid transportation support for high-quality economic development. (Reporter Chen Xiaowu Correspondent Liao Yiru)

Read on